CHANGZHOU UNITED WIN PACK CO.,LTD |
Verified Suppliers
|
|
For Cement Bag 12 Shuttle Circular Loom Full Automatic Woven Sack
Production Line
Description:
Heavy-duty Circular Loom means circular loom is capable of
weaving the fabrics over 400g/m2. For high strength woven
geo-textile Chinese Standard GB/T17641-1998 lists the specification
including 400g/m2 , 460g/m2, 520g/m2, 640g/m2 etc, these fabrics
exceeds the weaving ability of ordinary circular loom, but easy to
be woven by HLW12 due to its heavy-duty property, even 800g/m2 can
be woven.
Why low strength loss Low strength loss ,i.e. strength loss less
than 5% during weaving.
1.For current circular loom , strength loss is usually 15%
while weaving fabrics 80-210g/m2, 20% for exceeding the this scope.
Thus for same slit film, fabrics woven by circular loom of low
strength loss will gain 10% higher in strength then those woven by
current circular loom. As such to reach at the same strength,
circular loom of low strength loss will save 10% material (slit
film) than ordinary circular loom does.
2.For circular looms of low strength loss have less scathe to slit
film, compared with those circular loom can only weave fabrics at
55-230g/m2, they possesses wider weaving scope and more
flexibility, and capable of weaving fabrics at 40-800 g/m2.
3.As folded diameter of circular loom increases, warps increase,
too, meanwhile the chances of stop for slit film break also
increase, which lead to flaw and low production, that's why current
ordinary circular loom will be out of run if increasing width and
warps. On the contrary warp break rate is almost zero for circular
looms of low strength loss, that's true for even increasing up to
4000, as such circular loom with over-wide folded diameter can only
be those circular loom of low strength loss.
Specifications:
No.s | Mould | Shuttle Qty.(pcs) | Max.fold width(mm) | Max. Open width(mm) | Warp no.s(pcs) | Speed(RPM) | Main power(KW) |
1 | UWCL-24/16000 | 24 | 8200 | 16400 | 8000 | 5~25 | 37 |
2 | UWCL-20/11000 | 20 | 5500 | 11000 | 5376 | 5~28 | 22 |
3 | UWCL-16/8300 | 16(12) | 4150 | 8300 | 4800 | 5~41 | 18.5 |
4 | UWCL-12/7800 | 12(14) | 3900 | 7800 | 4400 | 5~41 | 18.5 |
5 | UWCL-12/7200 | 12(14) | 3600 | 7200 | 3780 | 5~45 | 18.5 |
6 | UWCL-12/6500 | 12 | 3260 | 6600 | 3620 | 5~51 | 11/15 |
7 | UWCL-12/6000 | 12(10) | 3050 | 6100 | 3200 | 5~51 | 11/15 |
8 | UWCL-12/5400 | 12(10) | 2700 | 5400 | 2880 | 5~64 | 11/15 |
9 | UWCL-10/4800 | 10(8) | 2400 | 4800 | 2880 | 5~64 | 11 |
10 | UWCL-10/4400 | 10(8) | 2200 | 4400 | 2640 | 5~72 | 7.5/11 |
11 | UWCL-8/3500 | 8 | 1750 | 3500 | 1976 | 5~80 | 7.5 |
12 | UWCL-6/3200 | 6(8) | 1600 | 3200 | 1920 | 5~80 | 7.5 |
13 | UWCL-6/2700 | 6 | 1350 | 2700 | 1512 | 5~100 | 7.5 |
Machine Details:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine
arrival your factory, non-woven material, power source, air
compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15
days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air
tickets, hotel, food, and also their salary 80USD one day per
person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity
parts and two years guarantee for mechanism, starting from finished
installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the
warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay
salary for our technicians 80USD/day for each person.