Home Companies Cangzhou Huachen Roll Forming Machinery Co., Ltd.

Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min

Cangzhou Huachen Roll Forming Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Industrial Zone, Botou City, Hebei Province, China

Contact name:Jing

Inquir Now

Cangzhou Huachen Roll Forming Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min

Country/Region china
City & Province hebei
InquireNow

Product Details

 

High quality double metal sandwich panel roll forming machine production line

 

 

Glue Pump Discharge

 

This machine adopts K-9 Type Glue Metering Pump, low rpm, high precision. The glue quantity is adjustable between 0.1-0.2kg/min and average usage amount is 0.25-0.4kg/㎡.

 

 

Product Thickness

 

The thickness of sandwich panel is 50-250mm. The machine can process various of different thickness and scale by adjusting the distance between the upper layer and lower layer, the cutting tool holder up and down and the feeding device.

 

Installation dimension28000 * 2500 * 2500 mm
Total Power25 kw
Voltage380 V 50 HZ 3 phase

 

 

How to cleaning the glue pump

 

Remove the sprocket and the six screws on both sides, demount the gears and bearings from the inside, and put them and the three plates in a water solution of xylene or lacquer thinner and soak it for a while, then clean it.
Flatten the joints of the three boards with butter, install the gears and bearings in order, and tighten the screws.
Attention: The normal operation of the equipment also requires your careful maintenance!

 

 

The material of the corefoam or rock woll                                
 Motor25 KW
Production Speed 0 - 5 m/min
Annual output6000000 m2

 

 

Maintenance after shutdown the glue


1.If you start up the machine every day, the pump station should be specially treated after shutdown and it will work normally the next day.


2.If the machine is shut down between 16-48 hours, all the small holes in the hose should be plugged with a pin and you can continue to work after pulling it out.


3.If the machine is shut down for 48 hours, the dripping hose should be removed and put away, the suction hose should be put back the glue barrel and insert into the glue liquid.


4.If the machine is shut down for a long period of time, you should start the glue pump once every three to five days, and cycle it for five to ten minutes to ensure that no air enters or you can remove where the glue is passes through, clean it and store it. This method is taught by professionals, please learn it and remember it.

Hot Products

PPGI for corrugated water wave wall panel roll forming machine 1000mm coils Machine details Rows of ...
Description Weight 8T Suitable Material GI PPGI Width of Raw Material 4000mm Thickness of Raw ...
Roof Sheet Roll Forming Construction Materials Making Machine Description Weight 3.6T Appearance ...
Parameter of Machine Custom 13 - 22 Forming Station Metal Roof Tile Roll Forming Machine For Color ...
Quick Detail: 1. Suitable to process: GI/PPGI 2. Width of the plate: 2600m/4000mm Equipment ...
Quick Detail: φ70mm Galvanized Roofing Sheet Roll Forming Machine With 19 Rows Rollers 1. Suitable ...