Home Companies Jiangsu Lebron Machinery Technology Co., Ltd.

Durable Door Frame Roll Forming Machine Fully Automatic High Efficiency

Jiangsu Lebron Machinery Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China

Contact name:Alfred

Inquir Now

Jiangsu Lebron Machinery Technology Co., Ltd.

Durable Door Frame Roll Forming Machine Fully Automatic High Efficiency

Country/Region china
City & Province wuxi jiangsu
InquireNow

Product Details

High Quality High Efficiency Durable Fully Automatic Door Frame Roll Forming Machine

 

 

1. Description of Door Frame Roll Forming Machine

 

The door frame forming machine is a roll forming machine used in the steel plate cold forming industry. It can continuously shape the steel plate through an automatic press according to the customer's requirements and cut flies to a certain length.

 

The machine consists of a decoiler, feeding device, leveling device, cold-rolling forming, hydraulic cutting, receiving system, electrical control system, and hydraulic system. It has the advantages of high production efficiency, a high degree of automation, and low labor intensity.

 

Lebron-Machinery is manufacturing high quality Door Frame Roll Forming Machines, and most of the machines are exported to Australia, the UK, Ireland, Mexico, Brazil, Israel, Dubai, Russia, India, Taiwan, Singapore, Malaysia, Thailand, Philippines, Myanmar, Vietnam, South Africa, Mozambique, Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.

 

 

2. Technical Parameters of Door Frame Roll Forming Machine

 

WeightAbout 6000kgs
SizeAbout 7.5m*1.2m*1.0m (L x W x H)
Suitable MaterialGalvanized steel strip
Thickness0.8~1.2mm
Coil width240mm
Yield strength235Mpa
Rollers station18 Stations
Roller Shaft Diameter75 mm
Roll Forming Speed20-25m/min
Production SpeedApprox.15m/min
Roller Material45# steel, coated with chrome, quenched
Cutter materialCr12 mold steel, with quenched treatment
Controlling systemPLC and Converter
Electric power requirementMain power: 7.5 KW
Hydraulic power: 4 KW
Electric voltage380V 50Hz 3 Phase (as per local requirement)

 

 

3. Main components of Door Frame Roll Forming Machine

 

NameQuantity
Uncoiler1set
Coil sheet guiding device1set
Main roll forming system1set
Punching device1set
Cutting device1set
Hydraulic station1set
PLC control system1set
Support table1set

 

 

4. Our Service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if the buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

5. FAQ

 

1. Q: How to visit our company:

A: 1). Fly to Wuxi Airport directly;

    2). By fast train From Shanghai Hongqiao station to Wuxi station, then we can pick up you at our factory.

 

2. Q: What should I provide if I want to customize the machine?

A: You need to provide the profile drawing, material, thickness, voltage, and your special requirements. Then, our technology team will analyze and offer you a suitable technical proposal.

 

3. Q: What is the Warranty?

A: 12 months

 

4. Q: What can you do if the machine is broken?

A: Our machine's warranty period is 12 months, if the broken parts can't repair, we will send new free parts to replace the broken parts. You need to pay the cost of the machine that exceeds the warranty period. we can negotiate to solve the problem, and we supply technical support for the whole life of the equipment.

 

5. Q: If need a technician to the workshop to debug and teach, how to do it?

A: We can send technicians to your country to install the machine. The buyer should bear the expenses including visa, round trip ticket, and suitable accommodation, also the buyer should pay a salary of 100 USD/day.

 

 

 

 

 

 

Hot Products

Over 30 Meters Per Minute High-Speed Stud And Track Forming Machine Full Automatic 1. Description: ...
Full Automatic High-Speed Stud And Track Forming Machine Steel Construction Usage 1. Description: ...
Steel Building Materials Steel Stud And Track Forming Machine Steel Framing Machine 1. Description: ...
High-Speed High-Efficiency Steel Stud And Track Roll Forming Machine PLC Controlled 1. Description: ...
Omron Encoder Siemens PLC High-Efficiency Steel Stud And Track Roll Forming Machine 1. Description ...
5.5KW Fully Automatic Steel Stud And Track Roll Forming Machine Siemens PLC Controlled 1. Descriptio...