Home Companies Yixing Boyu Electric Power Machinery Co.,LTD

Vertical Take Off And Landing Drone Transmission Line Stringing Tools For Power Line

Yixing Boyu Electric Power Machinery Co.,LTD

Contact Us

[China] country

Trade Verify

Contact name:Green Lu

Inquir Now

Yixing Boyu Electric Power Machinery Co.,LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Vertical Take Off And Landing Drone Transmission Line Stringing Tools For Power Line

Country/Region china
Categories Aircraft
InquireNow

Product Details

 

Transmission Line Stringing Tools Professional Vertical Take Off And Landing Drone For Power Line

 

Drone for power line project

It has two type, Easy to carry around.

The battery warranty lasts for 3 months, the motor warranty lasts for 6 months, the ESC warranty lasts for 6 months, and the unmanned aerial vehicle warranty lasts for one year if no artificial damage is caused to other electronic products.

 

Type8 rotorsQTy
Body materialFull carbon fiber4
Brushless motor 8
Flight control+GPSDJ-V21
HD camera 1
Image transmitter5.81
Remote controlTIANDIFEI AT91
Ground display 1
OSD 1
PACKAGE 1
Charger 1
Dispenser 1
Display battery11.1V 2200mA1
Take-off and landing modeVertical take off and landing 
Remote control, remote sensing range≤1.5km 
Standard flight weight8kg 
Effective load weight5kg 
Battery typeLithium battery 22V 16000mA2
Load flight timeAbout 15-20 minutes 
Max flight speed14m/s 
Relative flying height0-2000m, as per country's limited flying height 
Flying speed0-15m/s (0-54km/h) 
Flight navigation control accuracyVertical 0.5m, parallel 1m 
Working temperature-40°C-60°C 

 

Application

1.The trees in the virgin forests often encounter bushes, virgin forests, etc. during the construction of the national grid. This will definitely affect the progress of the construction. When passing through the virgin forest, the trees cannot be felled. This undoubtedly adds a lot of difficulty to the construction of the project, and with the lined drone, it is easy to fly over the trees and cast a guide rope to the ground.
2.In the traditional wire-laying operation on the Yangtze River, the tow rope can only be towed by the tugboat over the water surface. The construction water surface must be sealed first. The closure of the navigation will also cause many economic losses to the country and the construction party. The personnel stood on the ship and remotely dragged the helicopter of the guide rope so that the guide rope could fly over the Yangtze River and avoid sealing.
3.In the construction will also encounter swamps, lakes, farmland, highways, mountains, etc., when people are unable to achieve the construction of the line, the line of drones also show their talents, complete the task.

4.The situation of charging across the power usually exists in the process of circuit reconstruction. It is necessary to straddle a new line on the basis of a power-on line. In order to ensure the safety of construction workers, traditional construction can only be used first. After the line is powered off and then constructed, the overhead drone can be used to avoid power outages.

 

Hot Products

Transmission Line Stringing Equipment TY40 Max Intermittent Pull 40kN Hydraulic Puller Together with ...
Transmission Line Stringing Equipment TY40 77kw(103hp) Hydraulic Puller Cummins Engine Model TY40 ...
TY120 Transmission Line Stringing Equipment 120kN Cummins Engine Hydraulic Puller The machine allows ...
Transmission Line Stringing Equipment 129kw(173hp) Cummins Engine Hydraulic Cable Puller The machine ...
Transmission Line Stringing Equipment TY90 Hydraulic Puller Cummins Engine TY90 Hydraulic Puller ...
Transmission Line Stringing Equipment Diesel 118kw(158hp) Hydraulic Puller Max Pull 100kN This ...