CHINA HARZONE INDUSTRY CORP.,LTD. |
Verified Suppliers
|
|
Hot Sale High Quality Metal Construction Bailey Bridge Used
Construction Bridge are portable steel bridge,It has been widely used in
various fields, the most important feature of it is to achieve a
variety of spans, bear carrying capacity, light and handy
components, easy to dismantle and strong adaptability can be
quickly completed with simple tools and manpower.
The surface protection can be paint or hot-dip galvanized.
Specifications:
Single lane: | Standard roadway: 3.15m / 4.2m | Single lane: 30ft-200ft |
Double lane: | Standard roadway:7.35m | Double lane:30ft-180ft |
Load: design according to different requirements | Deck: steel deck/timber deck | |
Bridge type: CB100, CB200 |
Introduction
Bailey Bridge is a standard bridge equipment, it adopted the most popular and extensively in the world
Advantage
Possessing the features of simple structure,
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity
convenient transport, speedy erection
Features
1. Due to the steel isotropic, quality of a material is
uniform and modulus of elasticity, that make steel bridge in the
working condition and calculation compared with the assumption
2. Steel bridge generally USES factory, site splicing, the
construction period is short, processing convenient and not
affected by seasonal effect.
3. Steel bridge is suitable for industrialized manufacture and very
convenient to transport.
4. Steel bridge is easy to repair and replace,long
lifetime,material can be recycled.
5.High strength and big stiffness , relative to the concrete bridge
can be reduced trabecular high and self-respect
Application
Beam bridge,rigid frame bridge,arch bridge,suspension bridge,cable-stayed bridge, passenger foot-bridge.
Mixture form to erect all kinds of
The bridge elements are small enough to be carried in , and the bridge is strong enough
to carry.
Using the bridge equipment, the suspension bridges of varied span can be erected.
Temporary Bridges, Emergency Bridges and Fixed Bridges.
The bridge has the advantages of few components, light weight and
low cost.
Bailey Bridge requires no special tools or heavy equipment for
construction,
It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is
similar to the compact 100 panel
bridge from their appearance. The difference is its increased panel
height to 2.134m. It employed the method of alternating joints
between Reinforcement Chords and the joints between panels. This
method can decrease inelastic deformation caused by the oversized
pinholes.
Pre-arch method is used to additionally cut down mid-span and
vertical deflection to a larger degree.
Bolt-connected components use the orienting sleeve- fixing method
to increase accuracy of connections. Shear is created in orienting
sleeves and tension is developed in bolts, which increase the usage
life of the bolts and ensure the safety of panel bridges. Wind
resistant brace is made to be composite type and is connected to
transom/girders to improve overall stability of panel bridges.
Competitive Advantage:
Low cost
Long fatigue life
Heavy loading capacity
Great stability
Light weight
Easy and fast erection