![]() |
[China]
Trade Verify
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact name:Sun Ruyu
CHINA HARZONE INDUSTRY CORP.,LTD. |
Verified Suppliers
|
|
Mechanized Bridge / Light Mountain Bridge / Emergency Bridge For
Plateau Area Vehicles
Light Mountain Bridge is mainly used to erect an emergency bridge for all sorts of
artilleries and vehicles to get across streams, trenches, ditches,
craters or other obstacles not wider than 20.5m.
It can be used in plateau (with boost engine and oil adapted),
mountain area, plain and paddy field area.
Specification for Light Mountain Bridge |
|
Folded outline dimension (L*W*H) | 10960*3200*3640mm |
Gross weight | 21.8t |
Tracked load / Axle load | 22t / 10t |
Bridge weight | 6.5t |
Bridge length | 22.5m |
Negotiating width (on hard banks) | 20.5m |
Section length | 7.5m |
Roadway width | 3.2m |
Track girder width | 1.16m |
Erection / Retrieval time | 10/10 mim |
Max. twist in erection | ±5% |
Allowable bank height difference | 2.0m |
Operator | 3 operators |