Herbert (Suzhou) International Trade Co., Ltd |
Verified Suppliers
|
|
Customized Aluminum Curtain Wall Construction Durable Building
Advantages
1, Light quality
The use of curtain wall can greatly reduce the weight of the
building, thus reducing the cost of foundation works.
2, Flexible design
Good artistic effect, architects can design various shapes
according to their own needs, can present different colors,
coordinate with the surrounding environment, with light, etc. to
make the building and nature as one, so that high-rise buildings
reduce the sense of oppression.
3, Systematic construction
Systematic construction is easier to control the construction
period, and it takes less time.
4, Easy to update and maintain
As it is built on the periphery of the building structure, it is
convenient to repair or update it.
data table
Steel framework | 1.Steel beam | |||
(Q235B,Q355B) | 2.Steel column | |||
3.Bracing | ||||
4.H cross-section steel,box cross-section steel,round pipe,round steel, | ||||
5.L steel,etc. | ||||
Wall and roof | 1.Single steel sheet 0.36mm-0.6mm thick | |||
2.Sandwich panel with EPS,PU,glass wool and rock wool(50-120mm) | ||||
Door | 1.Roller door | |||
2.Sliding door and sidewall door | ||||
3.Steel sheet, sandwich panel or aluminum-alloy. | ||||
4.According to your requirements | ||||
Window | 1.Sliding window | |||
2.Plastic-steel frame or aluminum frame | ||||
3.According to your requirements | ||||
Gutter | 1.Aluminum-zinc steel sheet | |||
2.Stainless sheet | ||||
Downpipe | 1.PVC | |||
2.Stainless pipe | ||||
Skylight panel | FRP,1.5mm,2.0mm,2.5mm,according to your requirements | |||
Ventilation | 1.Turbine vent | |||
2.Ridge vent | ||||
3.According to your requirements | ||||
Other materialss | Self-screwing tapping,bolt,nut etc. |
1. Who we are? We are a global one-stop manufacturer of steel structure solutions. We can offer the service from good design to installation with good quality. 2.Factory or trade company? We are factory, so the factory competitive price will be offered.Our factory covers an area of 360,000 square meters.Our production capacity is 150000 tons per year. 3. Quality assurance and guarantee? Established a procedure to check products at all stages of the manufacturing process-raw materials. in process materials. validated or tested materialsfinishedoods.etc. If there is one quality problems in one project.5%contract amount will be returned 4. Do you offer quiding installation on site overseas? Yes. we can povide the service of installation.We can send our professional technical enaineer and teams to offer the installation on site overseas. |