Home Companies Guangzhou Jet Scaffold & Formwork System Co., Ltd.

Building Formwork Steel Scaffolding Systems Alloy 6061 T6 Silver Aluminium Scaffolding Panel Slab

Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Active Member

Contact Us

[China] country

Address: NO.3 Xintang Road,Guangzhou City,China

Contact name:

Inquir Now

Guangzhou Jet Scaffold & Formwork System Co., Ltd.

Building Formwork Steel Scaffolding Systems Alloy 6061 T6 Silver Aluminium Scaffolding Panel Slab

Country/Region china
City & Province guangzhou guangdong
Categories Scaffoldings
InquireNow

Product Details

Alloy 6061 T6 Silver Aluminium Scaffolding Panel Slab Building Formwork System for Concrete Construction
 

Product Description

Best Price Construction Metal Concrete Formwork For Reinforcement

Building aluminum formwork as a new type of building formwork in recent years, more and more places in the world's developed countries can see their applications.

 
Advantages of aluminum template
 

1:  The construction efficiency is high and the cycle is short, convenient construction, repeatability, ease of use, and low cost.
 
2:  It has well stability and high bearing capacity, Carrying capacity can reach 60KN per square meter.
 
3:  Aluminum alloy material can be recycled,All materials are renewable materials, energy saving,
environmental protection, low carbon, emission reduction.
 
4:  Less of the Support system, easy to walk.
Large operating space, construction personnel, material handling flow.
 
5:  It also has a wide application scope, Aluminum formwork system is applicable to all building components.
 
6:  The design of a molding with high precision and practical.Very suitable for the standard layer of high-rise, high-rise buildings.
 
7:  Good effect of concrete surface after removal the model.Don't need for plastering, can save two times the cost of plastering.
 
8:  Site doesn't have produce construction waste, It's more safer of construction.

Packaging & Delivery

Packaging Details
1. Protective film sticked on profile's visible surface, foam paper interleave each piece. Adequate pieces wrapped in small bundle by shrink plastic film;
2. 50-100pcs Per Bulk/ With Steel Plate/ Customized Package
Port
Guangzhou
Lead Time :
Shipped in 20 days after payment


Material
 
Aluminum 6060-T6
 
Size
 
Design accroding to project drawing
 
Finish
 
Special coating
 
Performance
 
One-time monolithic pouring
 
Technology
 
Automatic Welding
 
Certificate
 
ISO 9001:2008 ISO 3834

 

Plug Pin & Pin Piece
Material: 45# steel / Q235 steel

 
Company Information

Company NameGuangzhou Jet caffold&formwork System Co., Ltd
 ISO9001:2015 certified factory for manufacturing and sales of scaffolding
 19years, 120 workers, 60,000 Sqm2 flooring
 Auto-welding lines, HDG and painting lines
  
CertificationAS/NZS 1576, ANSI SSFI,SGS,GE
Main ProductsFormwork,Scaffolding pipe, Ringlock Scaffold, Cuplock Scaffold,Steel plank,Scaffolding ouplers,  etc.

Hot Products

Low Average Cost Construction Scaffolding Steel Props Scaffold Best Price Formwork Props Product ...
ADJUSTABLE STEEL PROP has a high capacity of load-bearing and is used for supporting the formwork ...
SAFETY FIRST FOR SCAFFOLDING PRODUCTS 1. Light Duty Props used to support the concrete formwork ...
Quantity factory price scaffolding steel props shoring props Heavy duty prop-Middle east or German ...
China Manufacturer Formwork Props Construction Scaffolding Props used Scaffolding Part Props for ...
Strong Loading Capacity Formwork Steel Shoring Prop Scaffold Best Price Construction Props Heavy ...