Sussman Machinery(Wuxi) Co.,Ltd |
Verified Suppliers
|
|
1.2mm-2.0mm Thickness Vineyard Post Trellis Grape Stakes Roll Forming Machine
Vineyard post, also called vineyard stake, vineyard trellis stake and grape trellis. It is a type of high strength, long service life and little maintenance post for supporting grape and other fruit normal growth in vineyard, orchard, grape manor and agriculture plantation and farming. The vineyard post is popular in European market and American market, such as Spain, France, Chile and so on.
Specifications of vineyard post
Technical Parameter
1.1 | Rolling speed | 2-3m/min or 5-6 meters/minute, 0-20 meters/minute |
1.2 | Rolling thickness | 1.2-2mm |
1.3 | Raw material | Galvanized steel sheet G550 |
1.6 | dimension | 6500×600×1200(mm) |
1.7 | Effective width | 50mm |
1.8 | Roller stations | About 16 stations
|
1.9 | Roller material | Gcr15, coated with chrome, Quenching |
1.10 | Shaft diameter | Φ60mm ,material is 45# forge steel |
1.11 | Transmission | By Chain |
1.12 | Material of chain | 45# forged steel with frequency quenching, 12A |
1.13 | Main Motor | 7.5kw |
1.14 | Material of cutting | Cr12Mov with quench HRC58-62° |
1.15 | Cutting Tolerance | 6m+-1.0mm |
1.16 | Voltage | 220v, 60hz, 3phase |
Main Components
S.N | Equipment Name | Quantity |
1 | 3T hydraulic De-coiler | 1 set |
2 | Leveling device 200mm | 1 set |
3 | Servo feeding device 200mm | 1 unit |
4 | Press machineJH21-63 | 1 unit |
5 | Main roll forming machine | 1 set |
6 | Cutting holder | 1 set |
7 | Hydraulic station | 1 set |
8 | Control system ( including control box) | 1 set |
9 | Out tables | 2 units |
10 | Spare parts | 1 package |
16 | Cutting dies | 1 set |
17 | Punching die set | 1 set |
Working Flow of Roll Forming Machine
Decoiler----feedingwithguide---Punching----Rollforming----Cutting----Products collecting
Profile of product
Application:
After-sale Serive
- The seller take responsibility to installation and
commissioning of the equipment and free training. After machine
arrive the destination, by the request of the buyer , the seller
will provide 1 technical engineer to guide installation and
training , and the buyer should give the technical person with full
cooperated.
- Installation period: about 5 days after the complete
preparation by the buyer such as the foundation and all necessary
accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the
buyer should pay for installation and commissioning fee 100$/day to
the point account of the seller. The two-way ticket,visa, food,
hotel , the translator and insurance are all should provide by
buyer with full responsibility.
-The seller supply technical data (including forming
mould drawing, electrical elements drawing and equipment drawing
etc.)