Home Companies HORIZON FORMWORK CO., LTD.

Doka Frami Clamp Concrete Forming Accessories Cast Iron Material

HORIZON FORMWORK CO., LTD.
Active Member

Contact Us

[China] country

Address: VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA

Contact name:H. Chang

Inquir Now

HORIZON FORMWORK CO., LTD.

Doka Frami Clamp Concrete Forming Accessories Cast Iron Material

Country/Region china
City & Province xingtai hebei
Categories Formwork
InquireNow

Product Details

Doka Frami Clamp to Align Wall Formwork Panels ,Concrete Forming Accessories

 

Advantages of the Frami clamps:

1). Provide self-aligning, crane-handling and safe connections between the panels

2). One single standard clamp makes assembly work simple and fast.

3). Dirt-resistant and hard-wearing for site use

4). Easy to fix. A formwork hammer is enough to lock and release the clamp.

Pin Length

151mm

Width

110mm

Height

133mm

Weight

1.2kgs


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.

 

Hot Products

Removable Scaffolding Tripod to Stabilise Props in Slab Formwork Construction The removable folding ...
Galvanized Adjustable Guardrail Post 1.0m for Slab Table Formwork System As protection against ...
Timber Beam H20 Slab Formwork Systems Universal For Slab Concreting HORIZON’s slab table formwork ...
Slab Table Formwork Systems, 2.5m x 5m Flexible Used For Slab Concrete Work HORIZON’s table formwork ...
Concrete Slab Formwork Systems 2.5m x 5m easily moved by trolley and C hook HORIZON’s table formwork ...
Concrete Slab Formwork Systems With Removable Folding Tripod H80 The removable folding tripod makes ...