Home Companies HORIZON FORMWORK CO., LTD.

Galvanized Formwork Tie Rod System , Flanged Wing Nut Steel Cone SGS Approval

HORIZON FORMWORK CO., LTD.
Active Member

Contact Us

[China] country

Address: VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA

Contact name:H. Chang

Inquir Now

HORIZON FORMWORK CO., LTD.

Galvanized Formwork Tie Rod System , Flanged Wing Nut Steel Cone SGS Approval

Country/Region china
City & Province xingtai hebei
Categories Formwork
InquireNow

Product Details

Formwork Tie Rod System of Flange Wing Nut, Water Stop, Steel Cone for Formwork

 

The Flanged Wing Nut is available in different diameters. With a larger pedestal, it allows a direct load bearing on walings.

It can be screwed on or loosened using a hexagon wrench, thread bar or hammer.

Steel cone is usually used in formwork tie rod system for easy removing the outer tie rod.

 

Formwork wing nut with flange:

Flanged Wing nutBar Ø (mm)Plate dia (mm)Height/Hex. (mm)Weight (Kg)
159055/270.50
1510055/270.62
1511055/270.80
2012060/361.00
156475/270.34
15100100/270.62
Part NameSpecificationWeight (kg)Remark

Tie-rod

 

D15

D20

1.5 kg/m

2.7 kg/m

L=6m;

Special length available upon request.

Super plate

 

D151.28Used in case of tie-rod and formwork panels are not vertical.

3-lug wing nut

 

D15

D20

0.97

0.78

For tie-rod D15;

For tie-rod D20

Waling plate

 

120 x 120 x 6, Φ19

120 x 120 x 8, Φ19

0.65

0.85

For tie-rod and nut D15;

galvanized

Water stopper

 

D15

D20

0.55

0.72

Used in water resistant wall;

With tie-rod D15 / D20

Anchor plate

 

D200.95Embedded in concrete as lost part


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.


Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.


What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.


Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.


HORIZON FORMWORK, your reliable formwork partner!

Hot Products

Horizontal Slab Formwork Systems , Movable Table Form For Concrete Slab HORIZON’s slab formwork ...
Flexible Handrail Post 1.5m for Slab Formwork System Safe Working Protection As protection against ...
Steel Prop Supporting Head In Slab Formwork Systems To Hold Timber Beams Steel prop supporting head ...
Four-Way Fork Head For Supporting H20 Beams In Slab Formwork Systems The Fork Head serves to keep ...
Removable Steel Folding Tripod For Holding Shoring Props in Slab Formwork System The removable ...
Adjustable Guardrail Post For Safe Working Protection In Slab Formwork System As protection against ...