Home Companies Sinuo Testing Equipment Co. , Limited

IEC 62133 Battery Testing Equipment Thermal Cycling Low / High Temperature Exposure Test

Sinuo Testing Equipment Co. , Limited

Contact Us

[China] country

Trade Verify

Address: Room 101, 1st Floor, No. 6, Third Street, Pingshan Industrial Zone 511495, Shibi Street, Panyu District, Guangzhou, China

Contact name:Zoe Zou

Inquir Now

Sinuo Testing Equipment Co. , Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

IEC 62133 Battery Testing Equipment Thermal Cycling Low / High Temperature Exposure Test

Country/Region china
City & Province guangzhou guangdong
Categories Polishers
InquireNow

Product Details

IEC 62133 Cell Battery Thermal Cycling Low and High Temperature Exposure Test Chamber

 

Overview:

 

This low and high temperature cycling test equipment is mainly used for electric and electronic products, components and other materials' high low temperature test, temperature alternating, damp heat test, environment simulate reliability test, etc.

 

This test equipment adopts programmable high accuracy microcomputer controller, 7-inch TFT color LCD touch screen, and Intelligent software, which can achieve easy and humanized operation.

 

Standards Compliant:

 

It conforms to IEC62133:2017 clause 7.2.4, IEC62133:2012 clause 7.2.4, IEC60086-4 clause 6.4.2 etc.

 

Technical Parameters:

 

Volume & Dimension
Effective Volume150L (can be customized)
Inner DimensionW500 mm*H600 mm*D500 mm (can be customized)
Overall Dimension

W700mm*H1750mm*D1570mm (can be customized)

Kindly remark: exact overall dimension pls refer to the final design drawing!

Performance
Condition

Air cooling type under environment temp.+5℃~+35℃, relative humidity≤85%.

No load (without specimen in the testing zone)

Temp. Range-40℃~+150℃
Temp. Fluctuation±0.5℃
Temp. Deviation≤±2.0℃
Temp. Uniformity≤2.0℃
Temp. Heating TimeFrom -40℃ to 80℃, full range non-linear average about 5℃/mins, no load
Temp. Cooling TimeFrom 80℃to -40℃ , full range non-linear average about 5℃/mins, no load
Temp. Overshoot≤±2℃
Max. LoadingNo
Humidity Range20%RH~98%RH
Humidity Fluctuation≤±2.5%RH
Humidity Deviation>75% RH: ≤+2, -3%RH, <75%RH:≤±5%RH
Constant Max. Heating Load

No

 

Temperature

Humidity Control

Diagraph

 

 

Noise≤70dB(A Level)
Structure & Material
External ChamberAdopt double electrostatic resin high temperature paint galvanized sheet.
Internal Chamber

Internal chamber with 1.2mm thick SUS#304 high &low temperature

resistance stainless steel. Bottom with 2mm thick #304 stainless

steel, with high strength square tube connection reinforcement , loading capacity with ≥250KG/㎡

Insulation MaterialAdopt flame retardant high strength PU Polyurethane foam insulation material with thickness of 100mm, heat preservation coefficient less than 0.0212kcal/Mohr.
Chamber DoorSingle open door, Door size: W500XH600mm.
Observation WindowWith vacuum glass observation window (W300 xH400mm) on the door; and door frame with electric heat resistant, anti-frosting, anti-condensing devices, ensures clear observation of the specimen under testing
Testing HoleOne ¢50mm testing hole on left of the chamber, with silicon seal and stainless steel cover.
SealingAdopt original imported silicon rubber strip, with high sealing performance
Sample HolderSUS#304 stainless steel sample holder, 2 layers, loading capacity: >50KG/layer.
Pressure Balance PortInstalled mechanical pressure close type balance device to avoid pressure difference influence the test chamber strength when do high temp. high humidity test.
Lighting Inside ChamberWith one Philip brand energy saving light (9W) inside the observation window

 

How is the differences of the thermal cycling test procedures between IEC 60086-4 and  IEC 62133-1?

 

Test Procedure as per IEC 60086-4:2014 clause 6.4.2:

 

Test cells and batteries shall be stored for at least 6h at a test temperature of 72 ℃, followed by storage for at least 6 h at a test temperature of -40 ℃. The maximum time for transfer to each temperature shall be 30 min. Each test cell and battery shall undergo this procedure 10 times. This is then followed by storage for at least 24 h at ambient temperature.

For large cells and batteries the duration of exposure to the test temperatures shall be at least 12 h instead of 6 h.

 

 

Test Procedure as per IEC 62133-1:2017 clause 7.2.4:

 

Fully charged cells or batteries are subjected to temperature cycling (-20 ℃, +75 ℃), in forced draught chambers, according to the following procedure.

Step 1: Place the cells or batteries in an ambient temperature of +75 ℃ ±2 ℃ for 4 h.

Step 2: Change the ambient temperature to 20 ℃ ±5 ℃ within 30 min and maintain at this temperature for a minimum of 2 h.

Step 3: Change the ambient temperature to -20 ℃ ±2 ℃ within 30 min and maintain at this temperature for 4 h.

Step 4: Change the ambient temperature to 20 ℃ ±5 ℃ within 30 min and maintain at this temperature for a minimum of 2 h.

Step 5: Repeat steps 1 to 4 for a further four cycles. Transition from Step 4 to Step 1 within 30 min.

Step 6: After the fifth cycle, store the cells or batteries and conduct a visual check after a rest period of at least 24 h.

 

Hot Products

IEC60456 Water Supply System For Washing Machine Performance Test System overview The test system is ...
Freezing Load Test Package for IEC 62552 Refrigerator Energy Efficiency Test Overview: The ...
IEC 60312 Vacuum Cleaner Air Performance Testing System PC Automatic Operation Product information: ...
ISO 5151 60K BTU Computer Control Dual Code Air-Enthalpy Calorimeter System introduction: The air ...
Comprehensive Energy Efficiency Test System for Washing Machines Refigerators Freezers Water Heaters ...
IEC 60456 Washing Machines Performance Testing Room Energy Efficiency Enviromental Lab Product ...