Home Companies Gnee (Tianjin) Multinational Trade Co., Ltd.

Fabrication Hotel Gnee Steel Structure Building Prefab High Rise

Gnee (Tianjin) Multinational Trade Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: 25th Floor, Huafu Commercial Center, Wenfeng District, Anyang City,Henan Province

Contact name:Kelly Zhang

Inquir Now

Gnee (Tianjin) Multinational Trade Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Fabrication Hotel Gnee Steel Structure Building Prefab High Rise

Country/Region china
City & Province anyang henan
Categories Workshops & Plants
InquireNow

Product Details

Steel Fabrication Hotel building Prefab High Rise Steel Structure Shopping Mall Building Steel Warehouse Building

Gnee Steel has processed a two-story steel structure warehouse building in Sri Lanka. All steel structure parts bolted. We ship it to the customer’s site after processing it in the factory. It installs by local workers. The width and length of the steel structure warehouse are 28.3 meters, the eave height is 6 meters, and the mezzanine is 3 meters high. The warehouse building uses the 50mm glass wool sandwich panel for the wall and roof, and the mezzanine floor using the galvanized metal deck.

 

Steel Fabrication Hotel building Prefab High Rise Steel Structure Shopping Mall Building Steel Warehouse Building

 

Description of Steel Warehouse Building SriLanka

We manufacture the steel building components and the enclosure system, which according to the design drawings. To expand the production scale, the customer broadened based on the original warehouse. All steel structural components bolted. We provide all accessories, including trim, flashing, gutters, high-strength bolts, self-tapping screws, and downspouts.

 

The steel structure warehouse is simple to install and quick to construct. The entire steel structure warehouse project took about half a year from the start of processing to the completion of the installation. It also includes the time of shipping. Each project, our team will study the drawings, optimize the design scheme, and reduce the total cost based on safety as much as possible. We optimize the design and also provide the best installation scheme to minimize customers’ Work on-site; it provides customers with the best construction solution.

 

Every project begins with the communication between our team and customers. Usually, when our engineers calculate the quotation, they need the customer to provide the local wind speed, snow load, and also the live and dead loads on the roof. These are the essential calculation factors for steel structure buildings. The steel structure components we calculate must have sufficient strength to withstand severe external weather, and at the same time, be subject to the effects of earthquakes.

 

Steel Fabrication Hotel building Prefab High Rise Steel Structure Shopping Mall Building Steel Warehouse Building

 

Specification of Steel Structure

column and beammaterial q345 H section steel ( painted or galvanized)
wall&roof purlinc or z section steel, size from c120~C320, z100~Z200
wall&roof panelcolorful corrugated steel sheet ,sandwich panels with eps, rockwool, fiber glass, pu etc.
supportingsteel angle, steel pipe, steel round.
guttersteel sheet or galvanized steel sheet
rainspoutpvc pipe
doorsliding sandwich panel door or rolling metal door
windowpvc or aluminum alloy windows
accessoryanchor bolt,high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc.

 

Our Advantage

Advantages of steel structure building:

 

Large span:

Steel has the characteristics of high strength, lightweight, excellent overall rigidity, and strong deformation ability, so it widely uses for large-span buildings.

 

Low cost:

Compared with building materials alone, the price of steel is higher than concrete, but prefab steel structure buildings have the advantages of a lightweight, it is fast and straightforward construction.

 

Lightweight:

Steel components are lightweight, so the cost of the foundation is low. The steel structures are prefabricated. All steel structural components are produced in the factory and then shipped to the site for installation.

 

Fast Construction:

The construction is fast and straightforward. 10-15 people, and only can install a 2000 square meter steel structure workshop requires workers who can read steel building installation drawings, which significantly reduces labor costs.

 

Besides, the steel structure building is fast in installation. The entire building can be installed and put into use according to the customer’s expected time. The equipment inside the steel structure workshop starts to operate, which will create economic benefits and reduce the overall investment of the customer.

 

Steel Fabrication Hotel building Prefab High Rise Steel Structure Shopping Mall Building Steel Warehouse Building

 

Hot Products

Aisi Standard S355 Hot Rolled Q235nh Corten Carbon Steel Plates Characteristics of corten carbon ...
Iso 9001 Certificate Corten Steel Plate Weathering Resistant Steel The ASTM A242 specification is ...
Jis G3113 Corten Steel Plate Hot Rolled Wear Resistant Plate Corton steel has better corrosion ...
Iso 9001 Certificate S235 St37 A36 Corten Steel Plate For Building Compared to stainless steel, ...
Laser Cutting Astm A588 Corten Steel Plate For Garden Decoration A588 is an American Standard corton ...
China Q295gnh Q235nh Q355nh Corten Steel Plate In Manufacturing Corten Steel Plate products are ...