Gnee (Tianjin) Multinational Trade Co., Ltd. |
Verified Suppliers
|
|
Steel Structure Building Steel Construction Workshop Desperately
Needed Production Space For Joinery Workshop
A bespoke joinery and cabinetry business specialising in high
quality designs with their in-house manufacturing and installation
services. They have an extensive purpose built factory, that is
continually growing and developing to keep up with their growing
business demands.
Having recently invested in a purpose made machinery shop in 2017, identified the need to further progress their long-standing plans to extend their existing factory.
A new side extension was required to accommodate their need for increased production and storage capacity and make use of the space available at the side of the current building. The construction comprised of an independent hot rolled steel building, erected along the front and side of the existing unit. A key element of the project was that the new building included an integrated mezzanine floor to accommodate a new meeting room.
Forward thinking design features
Careful consideration had to be made to ensure that the staircase
the and floor configuration and design maximised the usable height
and floor space on both storeys. We also needed to ensure that good
access was maintained to seamlessly link their manufacturing
processes through into the new space.
To minimise the requirement for any intrusive support columns on the ground floor, the mezzanine structure was supported off the main portal steelwork.
Attention to detail
As a wrap around extension, the initial setting out and junction
details were key to making the project a success and to ensure that
the new structure blended in with the existing. Paying specific
attention to the roof profile and introduction of a bespoke valley
gutter.
The building is equipped with insulated cladding on both the roof and walls, providing a stable internal environment, allowing flexibility of use and guarding against condensation.
The skylights flood the workshop with plenty of natural light but also ensure they have plenty of usable wall space inside the factory. We supplied and installed a large aluminium window in the end gable giving the meeting room area on the mezzanine views out into the surrounding countryside.
Customer feedback
“We decided when we got planning permission for the new facility we
would want them to this for us as we were so pleased with the
machine shop. They provided an excellent service, we are very
pleased with the finished factory. They were very helpful
throughout the process.
The extension has given us 4,500 sq. ft of additional production space where it was desperately needed.
We are very pleased with the building and the work for the efforts by all concerned. So thank you to everyone and here is to the next extension on Phase III”
Specifications | 1)Size: MOQ is 100m2, width X length X eave height, roof slope |
2)Type: Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floors! | |
3) Base: Cement and steel foundation bolts | |
4) Column and beam: Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-section or Variable cross-section! | |
5) Bracing: X-type or V-type or other type bracing made from angle, round pipe, etc | |
6) C or z purlin: Size from C120~C320, Z100~Z200 | |
7) Roof and wall panel: Single colorfull corrugated steel sheet0.326~0.8mm thick, (1150mm wide), or sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~100mm, | |
8)Surface: Two lays of Anti-rust Painting! |