Shanghai Strong Metal Production Co., Ltd. |
Verified Suppliers
|
|
Aluminum Laser Cutting Prototype Stamping Bending Services Sheet Metal Fabrication
1 What does "Sheet Metal Assembly" mean?
The metal plate paste process is to paste it on the base plate, the general thickness is below 3mm. But most
of the following 3mm metal plate flatness is not high, large area of use of metal plate veneer, need to use the
base plate to assist the flatness of the veneer.
2 Technical Parameters
Product name | Aluminum Laser Cutting Prototype Stamping Bending Services Sheet Metal Fabrication |
Item | Sheet Metal Enclosure Manufacturers Sheet Metal Fabrication Service Sheet Metal Assembly |
Process | Punching, bending, Stamping, deep drawing, partial forming |
Tolerance | 0.1mm, |
Service | OEM |
3 Product Details
Use: water purifier, home appliance
Function: this is in the bottom of the water purifier and it is a
structure part, this is one of the parts that we
made and we will assemble them together after all parts are
finished.
Technology: metal stamping, punch press, bending.
4 About Strong
Strong metal was established in June 2003 with a total registered capital of 67 million yuan and a total
construction area of 30,000 square meters. It has 5 factories in total which are located in Nantong,
Taicang, Nanjing, Vietnam, and Shanghai.
Strong has many advanced production equipments: 50+ punch press machines (highest 1000 ton),
20+plastic injection machines (highest 740ton), 20+ bending machines (highest 600 ton), 20+ automatic
welding arms, 50+ welding working tables, 8+ laser cutting machines, and a 400m powder coating line,
etc. In terms of the QC testing tool, We have CMM, a two-dimensional measuring instrument, hardness
tester, salty frog tester, etc.
Strong focused on metal manufacturing and has comprehensive ability in mold self-design, metal
stamping, sheet metal, laser cutting, powder coating, welding, plastic injection, etc.
5 FAQ
Q: What are your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance
before shipment.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is
15-20 days if the goods are not in stock,
it is according to quantity.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay
the cost of freight.
Q: Are you a trading company or manufacturer?
A: We are a manufactory.
If you have another question, pls feel free to contact us.