Home Companies Hongum Technology (Shanghai) Co., Ltd

Robust Pig Slurry Pipe Plug Defecation Valve - Engineered with PE, PVC, and ABS Materials for Long-Lasting Performance

Hongum Technology (Shanghai) Co., Ltd

Contact Us

[China] country

Trade Verify

Address: 5F, No.200 Guoding Road, Shanghai China 201105

Contact name:Sophia Lau

Inquir Now

Hongum Technology (Shanghai) Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Robust Pig Slurry Pipe Plug Defecation Valve - Engineered with PE, PVC, and ABS Materials for Long-Lasting Performance

Country/Region china
City & Province shanghai shanghai
Categories Valves
InquireNow

Product Details

Robust Pig Slurry Pipe Plug Defecation Valve - Engineered with PE, PVC, and ABS Materials for Long-Lasting Performance

 

 

Introduction:

 

Simplify your pig manure management with our blister system, designed to rapidly transfer waste to a septic tank through a PVC piping system pre-buried beneath the pig house manure tank. The system comprises premium PVC pipe fittings, universal PVC fittings, and PVC pipes, as well as a high-density polyethylene blowdown valve with a rubber ring for superior durability. The valve is mounted on a bracket in the fitting to ensure optimal containment. Our system is available in international pipe diameters of 200mm, 250mm, and 315mm.

 

 


The main technical characteristics of blister feces:


Simplify your pig manure management with our Blister Fecal System - an advanced sealing system that utilizes a natural vacuum to quickly transport waste to a septic tank.

 

To ensure optimal performance, we recommend constructing the system with a 5% pipeline inclination for maximum discharge effect. Our system is designed to work seamlessly with a pig house septic tank height of 40-60 cm and a 10 cm collection pool height. The direct thrust system should be inclined at 5 mm per meter from the first stage of the tee pipe fittings to the septic tank.

 

To prevent sewage problems, such as leakage and backflow, we suggest installing exhaust valves at both ends of the system for added convenience.

 

 

Specifications:

 

Prod. No.Product NameDimension
19.21.22.01Stub with stay Type 1Ø250 mm H=400mm
19.21.22.02Extension with stayØ250 mm H=480
(Gluing)
19.21.22.03Apollo-Ball SetØ250 mm
19.21.22.04Stopper black b m/sØ315mm
19.21.22.05Stopper Black m/sØ250mm
19.21.22.06Sealing ring for PlugØ200 mm
19.21.22.07Sealing ring for PlugØ250 mm
19.21.22.08Air Escape ValveØ110 mm
19.21.22.09Air Escape ValveØ160 mm
19.21.22.10Gluing stub for AirØ110/250 mm
Escape
19.21.22.11Gluing stub for AirØ110/200 mm
Escape
19.21.22.12Mounting air valveØ110 mm
19.21.22.13Mounting air valveØ160 mm
19.21.22.14Double-socket, GreyØ110 mm
19.21.22.15Double-socket, GreyØ160 mm
19.21.22.16Overflow ValveØ160 mm
19.21.22.17PVC Pipe ( Made inØ200 mm
China) GluingT=4.9mm
19.21.22.18PVC Pipe ( Made inØ250 mm
China) GluingT=6.2mmcc

 

 

 

For optimal manure management, we recommend building a septic tank with a depth of 40-60 cm for storing manure water and other liquids produced during the production process. Different pig houses may produce varying proportions of fecal solids and liquids, so it's important to separate them using isolation and separation tanks based on recommended areas.

 

To ensure safe and efficient drainage, the drain valve should be pulled up to discharge the liquid. Starting with the sewage valve farthest from the reservoir, each discharge only takes 2-3 minutes. It's important not to discharge the manure at the same time to avoid any backflow caused by gas buildup in the pipe. We recommend discharging the tank every 14 days to reduce the presence of harmful gases and maintain a healthy environment for the pigs.

 

 

 

 

Our service:

 

1. Packaging is neutral packing or customized packing.

 

2. We will reply you within 24 hours.

 

3. We will also provide you with good after-sales service.

 

4. OEM or ODM orders are welcomed.

 

5. Trial orders are acceptable.

 

6. High quality and factory price.

 

7. 100% ensured the quality.

Hot Products

GEMU Code 3A / 13 Peroxide Cured EPDM Diaphragm One Piece Application examples: • Water treatment ...
Pharmaceutical And Biotechnological Rubber Diaphragm Seals GEMU Code 3A / 13 Application examples: • ...
Low Gas Permeability EPDM Diaphragm Replacement GEMU Code 14 Application examples • Water treatment ...
GEMU Code 17 EPDM Diaphragm Fabric Reinforced High Tear Resistance Application examples • Water ...
Fabric Reinforced GEMU Code 19 EPDM Diaphragm Reduced Adhesive Behaviour Application examples: • ...
GEMU Code 2 NBR Rubber Diaphragm Seals Mineral Oils Resistance Application examples Water treatment ...