Cangzhou Famous International Trading Co., Ltd |
Verified Suppliers
|
|
Galvanized Gutter Making Machine Downspout Metal Gutter Roll Forming Machine
Galvanized Gutter Making Machine Downspout Metal Gutter
Roll Forming Machine can bend the roll formed pipe, and let the drainpipe and the
bending connect to be the whole.The product after roll forming has
long working time than the tranditional ppc pipe, and not aging. It
can make the project more integrate, and help to enhance the image
of the all project.The equipment adopts PLC control, AC frequency and adjusting the
speed technology, and it realizes the continuous automatically
production, therefore, it is really a new type of energy-saving and
high-effective producing equipment for steel structure.
Specification
Galvanized Gutter Making Machine Downspout Metal Gutter Roll Forming Machine | |
Processing material | aluzinc/galvanized steel/colored steel coil |
Material thickness | 0.3-0.8mm |
Frame design | 460mm According to customer’s request |
Main motor power | 4 kw |
Material of forming roller | 45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter | Φ75mm |
Main motor power | 7.5KW |
Max. Line speed of roll former | 15m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power | 4KW |
Material of cutting blade | Cr12, hear treatment |
Electric Standard | 380V /50Hz/3PH or as per customer's requirements |
Main frame | 300H steel |
Installation
During the installation and adjustment of the
equipment, our engineers shall provide the training to the buyer’s
personal request to operate and maintain the equipment. Including
foundation construction, electrical works, hydraulic oil, safe
operation, and non-standard safety items, testing material and etc.
Guarantee
The warranty will be maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during the guarantee period, we will provide the parts free of charge, which is in the conditions of correct operation. (Natural disasters or factors which can’t be forced by human are excluded).
Payment terms
40% in advance
60% is paid before shipping