Standing Seam Roofing Panel Roll Forming Machine With PLC Control
Automatic standing seam roof forming machine is the special equipment for continuous rolling and cold forming on steel sheet. It adopts coiling steel sheet as the raw material, decoiling, continuous rolling and cold-forming, automatically cut to the size and specification which is required, and output the finished panels. The equipment adopts PLC control, AC frequency and adjusting the speed technology, and it realizes the continuous automatically production, therefore, it is really a new type of energy-saving and high-effective producing equipment for steel structure.
Specification
Main parameters of Metal clip lock standing seam roof machine | |
Material Width | 1200mm |
Thickness of Coil | 0.3-0.8mm |
Application | roofing system |
Estimated Dimension | 11500mmX1650mmX1800mm |
Total Weight | 5.8 Tons |
Main Power | 7.5 KW |
Hydraulic Pump | 4 KW |
Decoiler | Manual or Hydraulic Decoiler |
Forming Speed | 0-15m/min |
Forming Station | 26Rows |
Bracket | Welded with 36 # I-steel |
Material of Shaft | High Grade forged 45# Steel with 1st Rough Finished and then 2th Refined Finished |
Diameter of the Roll | 70mm |
Material of Roller | High Quality Cr12 Quenched HRC58-62 ° |
Processing Technology | Rough Processing ---Refined Processing--Hard Chromium Plating. |
Material of Rack | Complete Welded Structure of A3 Steel Plate 18 mm Thickness |
Transmission | Chain or Gear Box or universal joint |
Material of cutting blade | Cr12 with Quenched Treatment 60-62 ° |
Cutting system | Hydraulic Stop or Tracking Cutting |
Voltage | 380V/50HZ/3 Phase or as Customer Require |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.