Home Companies Beijing Jincheng Mining Technology Co., Ltd.

300m Full Hydraulic Water Well Drilling Rig Steel Crawler Mounted Deep Borehole

Beijing Jincheng Mining Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Room 1407,BuildingA,No.13,Beiyuan Road,Chaoyang District,Beijing,China

Contact name:Sekura Yu

Inquir Now

Beijing Jincheng Mining Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

300m Full Hydraulic Water Well Drilling Rig Steel Crawler Mounted Deep Borehole

Country/Region china
City & Province beijing beijing
InquireNow

Product Details

300m Steel Crawler Mounted Hydraulic Water Well Drilling Rig CWD300T

 

>> Introduction

Steel Crawler Mounted Hydraulic Water Well Drilling Rig CWD300T is a efficient,multi-function full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.

>> Characteristic

>> The rotary head,have two gear,rotation speed is 45-140rpm stepless adjustment and the rotary torque is 5000-6500Nm.
>> The pulling force can be regulated and controlled, which adapt the machine to deep hole drilling.
>> It can set up a generator which is convenient to welding or illuminate for work at night.
>> Main winch are available on the rig so it is high efficiency when the rig drill on mud rock and on the weathering formation.
>> The main drive of rig is hydrulic and the four landing legs and drilling tower are hydraulic controlled. Transfer case and mud pump clutch                  system are also hydraulic operated.
>> The tools winch winch is used for auxiliary lifting and casin.
>> The Hydraulic auxiliary functions are easy and efficient for guide extension, boom swing, boom lift, guide dumping.
>> Competitive in price, low cost of maintain.

>> Specification

SpecificationUnitCWD300T
Geology drilled All Kind
Drilling Type DTH & MUD
Drill system and operation Hydraulic
Hole DiametermmΦ90—Φ350
Hole Depthm300
Rotation TorqueNm5000-6500
Rotation Speedrpm70-140
Drill pipe diametermm76/89/102
Drill pipe lengthmm6000
Max. Feed SpeedM/min60
Max. Lifting SpeedM/min30
Feed Strokemm6600
Max. Pull back CapacityT16
Lifting force of WinchT1.5
Engine  
Diesel Engine type 4Cylinder,water cooling
Diesel Engine Brand YUNNEI
Rated Horse powerKw80
Compressor required(Optional) 
Pressure RequiredMpa15-30
Air consumptionm³/min1.5-2.5
Mud Pump(Optional/Separate or on board)
Model BW450
DisplacementL/Min450
Discharge pressure (Mpa)Mpa2
Dimension  
Net WeightKgs7000
Transportation dimensionmm5650*1700*2260
Work Dimensionmm3550*2660*9350
Ground Clearancemm305

 

>> Package & Delivery

>> Our Service

>> Pre-sale service

Acting as a good adviser, our well-trained sales groups and professional technical team propose most rational solutions for our valued client as per practical project requirement.

>> Select suitable model & matched equipment.

>> Strong technical support. Reply clients' questions within 24 hours.

>> Service During Sales

We have responsible team from raw material to finished products, and guarantee 100% pass rate.

>> Design and manufacture products basis of client's special equirement

>> Inspect each machine & matched accessories strictly before delivery

>> Timely inform client of production progress.

 

>> After Sales Service

We're always with you in after-sale service.

>> We can arrange related after-sales representatives for debugging and training at worksite when starting up. >> E-mail, call or door-to-door service in later using.

 

>> Overseas Service&Project

>> FAQ

Q: Are you original manufacturer?

 

Q: Which payment terms are available to us?Q: Which Incoterms 2010 terms can we work?
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
Q: How long will the delivery time take?Q: How about after sales service?Q:Spare Parts When You Need Them
A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

>> Related Products

Hot Products

>> Introduction >> The JCD1500 new model Full Hydraulic Core Drill Rig is developed by us with ...
>> Introduction Introduction of JCD150 >> JCD150 Full Hydraulic Portable Drilling Rig is a kind of ...
>> Introduction >> JCD2000 Hydraulic Core Drilling Rig is reasonable in design, excellent in ...
>> Introduction >> JCD300S Full Hydraulic Portable Drilling Rig is a kind of light weight core ...
>> Introduction >> The JCD1000 hydraulic core drilling rig of full hydraulic and rotator adopted the ...
heavy duty full hydraulic wireline diamond borehole mining core drilling machine >> Introduction >...