Home Companies Beijing Jincheng Mining Technology Co., Ltd.

400m Depth Yuchai Engine Crawler Water Well Drilling Rig CWD400

Beijing Jincheng Mining Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Room 1407,BuildingA,No.13,Beiyuan Road,Chaoyang District,Beijing,China

Contact name:Sekura Yu

Inquir Now

Beijing Jincheng Mining Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

400m Depth Yuchai Engine Crawler Water Well Drilling Rig CWD400

Country/Region china
City & Province beijing beijing
InquireNow

Product Details

400m Depth Yuchai Engine Crawler Water Well Drilling Rig CWD400

>> Introduction

CWD400T Multi-functional track mounted water well drilling rig is a efficient,multi-function full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.

CWD400T Crawler mounted drilling rig can drilling in all kinds formations by mud drilling in soft formation and air DTH hammer in rock drilling,DTH Hammer is applied in rock drilling, slag is discharged by air pressure and the offstage efficiency is ten times than traditional rotary drilling.

CWD400T deep water well drilling rigs, in cutting drilling or rotary drilling can be operated in unconsolidated layer, and the slag can be discharged under by mud, the impact drilling operation can also be adopted and slag can be discharged by pressure air, the hydraulic water well drilling rig suitable for drilling complicated geological conditions.

>> Characteristic

>> The drilling rig can use air DTH Hammer drilling and mud drilling.

>> Centralized control console is suitable for each manipulation and control. Rapid pulling and lifting reduce the auxiliary time and enhance the work efficiency.

>> The main drive system, the transfer case, gearbox, double-winch unit, mud pump, turntable,drilling tower, feed system are set up on the chassis.

>> It's a hydraulicrotary drilling rig with directional circulation. It can equipped with BW450 mud pump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is equipped with suitable drilling bit.

>> The power of drilling rig comes from a Yuchai engine,92kw Yuchai engine drives the large displacement high pressure plunger pump and it is characterized by powerful dynamic and stable performance.

>> The rotary head,have two gear,rotation speed is 70-140 stepless adjustment and the rotary torque is 4000-8000Nm.

>> The pulling force can be regulated and controlled, which adapt the machine to deep hole drilling.
>> It can set up a generator which is convenient to welding or illuminate for work at night.

>> Main winch are available on the rig so it is high efficiency when the rig drill on mud rock and on the weathering formation.
>> The main drive of rig is hydrulic and the four landing legs and drilling tower are hydraulic controlled. Transfer case and mud pump clutch system are also hydraulic operated.
>> Competitive in price, low cost of maintain.


>> Specification

SpecificationUnitCWD400T
Geology drilled All kind
Drilling Type DTH&MUD
Drill system and operation Hydraulic
Hole Diametermmφ90-φ450
Hole Depthm400
Rotation TorqueNm4000-8000
Rotation Speedrpm70-140
Drill pipe diametermm89/102/114
Drill pipe lengthmm3000/4500/6000
Max. Feed SpeedM/min60
Max. Lifting SpeedM/min30
Feed Strokemm6600
Max.Pull back CapacityT24
Lifting force of WinchT1.5
Engine
Diesel Engine type 6Cylinder,water cooling
Diesel Engine Brand YUCHAI
Rated Horse powerKw92
Compressor required(Optional)
Pressure RequiredMpa1.5-2.5
Air consumptionm³/min15-30
Mud Pump(Optional/Seperate)
Model BW450
DisplacementL/min450
Discharge pressure(Mpa)Mpa2
Dimension
Net WeightT8.5
Transportation dimensionmm5760*1850*2440
Work Dimensionmm3940*2890*9430
Ground Clearancemm305

>> Overseas Service&Project

>> FAQ

Q: Are you original manufacturer?

 

Q: Which payment terms are available to us?Q: Which Incoterms 2010 terms can we work?

A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.

 

 

A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.

A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.

 

 

Q: How long will the delivery time take?Q: How about after sales service?Q:Spare Parts When You Need Them

A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.

 

A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."

A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

 

>> Related Products

A.jpg

 

 

Hot Products

CSD200 Truck Type Water Well Drilling Rig CSD200 Multi-functional truck mounted water well drilling ...
CSD300 Truck Mounted Water Well Drilling Rig CSD300 Multi-functional truck mounted water well ...
JCDRILL Tractor Mounted Water Well Portable Drilling Rig TD200 Application The rig uses the tractor ...
CSD300 Truck Mounted Drilling Rig DTH drill bore hole water well drilling rig machine CSD300 Multi...
Deep Portable Diesel Engine DTH Water Well Drill Rig Machine >> Introduction >> TWD300 trailer ...
CSD200 Truck Type Water Well Drilling Rig CSD200 Multi-functional truck mounted water well drilling ...