Home Companies Hebei Kaixiang Electrical Technology Co., Ltd

3 Phase Power Banks Electrical Load Testing Equipment With Copper Conductor

Hebei Kaixiang Electrical Technology Co., Ltd
Active Member

Contact Us

[China] country

Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China

Contact name:

Inquir Now

Hebei Kaixiang Electrical Technology Co., Ltd

3 Phase Power Banks Electrical Load Testing Equipment With Copper Conductor

Country/Region china
City & Province shijiazhuang hebei
Categories Other Electric Power Tools
InquireNow

Product Details

 

3 Phase Power Banks Electrical Load Testing Equipment With Copper Conductor

 

Introduction

The system can accurately test the output power and load capacity of various generator sets.The system consists of two parts of measurement and loading, including AC load bank, data acquisition system, automatic load and drop control system, cooling device, auxiliary control,PC software,and so on.The user can freely select local control or software control to operate the load bank

Application

1. Users can set adjustable discharge power according to capability parameter and test request.

2. Voltage and current value can be displayed with multi-functional digital meter.

3. AC load bank is of all kinds of specifications and series, and include resistance, inductive and capacitive load.

4. Two or more Intelligent AC Load Bank can operate in parallel.

5. It can make stable state test,

6. Remote control by software.

7. Testing data can be saved or transferred by RS485, data can form curve, to be printed.

Technical Parameter

 

System Parameters
Rated voltage/currentAC 3 phase 4 wire400V/50Hz
Max load powerRisistive load:2000kW
Load stepsRisistive load: 11 steps,100,100,200,200,200,200,200,200,200,200,200kW.
Power factor1
Load tolerance(each step)±5%
Load tolerance(overall)±3%
Display precisionClass 0.5
Control Power Supply

3 phase 4 wire 380V/50Hz

About 35kW

Wire Connection

 

Load power supply input——Copper bar (star coupling)

Control power supply input——Connector-bar

Communication interfaceRS485,RS232
Insulation classClass F
Protection gradeIP54
Duty cycleContinuous
Cooling typeForced air cooling, horizontal air inlet, vertical air outlet.
Enclosure structureContainer sealing, with ladder to top of enclosure, with air inlet and air outlet mesh and protection door.
TransportationHoisting, with lifting lugs on top and standard installation fixing hole at bottom
Enclosure colorGrey(RAL7035)
Enclosure dimensionAbout4000mm×2350mm×2591mm(L×W×H)
WeightAbout 5500kg
Working environment parameters
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meters
Atmospheric Pressure86~106kPa
 
Main Features
(1) Real-time Monitor: through software display main parameter value, such as voltage, current, power, power factor, frequency and time.

(2) Data Collection Interval: the minimum steady-state data resolving time is 1 second, and the minimum transient data resolving time is 40μs.

(3) Stable Data Comparisons: the max value and min value of all the parameters in steady-state test are listed in software interface; it is convenient for user to compare.

(4) Data Save and Query: all test data are saved in the software, and according to generator set number easy to fast query in the history test data.

(5) Graphical Display: show real-time or history test data, and support to print curve and graph as follows:

1) Voltage, current, frequency and power curves in real-time; 2) voltage curve;

3) Current curve; 4) power curve; 5) frequency curve; 6) power factor curve;

(6) Test Report: display and support to print reports as follow:

1)Test report of generator set steady-state performance; 2)testing data report

(7) Data Format: all curves and graphs are outputted as".jpg"format, testing reports are outputted as".xls"format, and can be printed.

 

Hot Products

400V 200kW Automatic Portable Load Bank With Grey Colour and High Performance Introduction AC400...
500 KW load bank for generator UPS transformer testing Introduction The system consists of 1 sets of ...
resistive load bank 800 KW for thailand Generator UPS testing Introduction AC400V-800KW Portable ...
Portable dummy load bank 900kw for generator UPS testing Introduction AC400-900KW Portable Load Bank ...
600 KW portable ac load bank for generator UPS Transformer testing Introduction 1,AC400-600kW ...
3000 KW 3 Phase Load Bank high voltage power testing load bank for generator UPS testing Introductio...