Home Companies Shenyang iBeehive Technology Co., LTD.

Industrial Shed Design Q345 Steel Frame Warehouse Construction Prefabricated Building Big

Shenyang iBeehive Technology Co., LTD.

Contact Us

[China] country

Trade Verify

Address: Room 202, D07 building SISP, Hunnan District, Shenyang

Contact name:Kevin

Inquir Now

Shenyang iBeehive Technology Co., LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Industrial Shed Design Q345 Steel Frame Warehouse Construction Prefabricated Building Big

Country/Region china
City & Province shenyang liaoning
Categories Warehouses
InquireNow

Product Details

Industrial Shed Design Prefabricated Building Big Steel Structure Warehouse

Product Description

main steel frameH section steel beam and columns, painted or galvanized, galvanized C section or steel pipe
Secondary framehot-dip galvanized C purlin, steel bracing, tie bar, knee brace, edge cover, etc.
Roof panelEPS sandwich panel, glass fiber sandwich panel, rock wool sandwich panel, and PU sandwich panel or steel sheet
Wall panelSandwich Panel or Corrugated Steel Sheet
Tie RodCircular Steel Tube
BraceRound Bar
Knee BraceAngle Steel
Roof GutterColor Steel Sheet
DrawingWe can make the design and quotation according to your requirements or your drawing
CertificationISO9001:2000,CE.

 

Material Guarantee

1. Frame material:

*heavy duty hot dip galvanized steel tube
*sturdy and never rust
*last 10 to 15 years.

2. Fabric material:

*durable fabric
*100% waterproof, UV resistant
*300g/m2 PE, 11oz, fire resistant of CPAI-84 Section 5 standard
*650g, 900g/m2 PVC, 23oz, 32oz, fire resistant of DIN4102 B1 standard.

3. Accessories:

*steel bolts
*hot-dip galvanized anchors
*strong winches.

4. Package:

*painted strong steel box
*keep all parts and accessories safe and sound. China supplier arch building Prefabricated Steel Frame Warehouse

* Design

The design team of iBeehive Group adopts the international mainstream design software, and carries out design analysis in strict accordance with international standards in the design process of each project. While ensuring the safety, energy saving and high efficiency of buildings, it effectively reduces the material loss and waste of the project and ensures the economic design scheme of each project.

Our Company

iBeehive is a professional manufacturer of steel structure, bridge with 21 years experience, finished 3520 projects total 17600000 sqm. We specialize in providing complete solutions including consulting, design, fabrication and erection of high-quality pre-engineered steel building and steel structure products.

We have 2 factories with a total area of 21000 m², iBeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and 20 professional design team.

Success Case

Industrial Warehouse (13000M2) Argentina

Warehouse (14000M2)----Republic of Uzbekistan

Workshop (12000M2)----Canada

Warehouse (3600M2)---Romania

Vegetable Market (2500M2)----Mauritius

Pig shed (3500M2)---USA

Chicken shed (2800M2) )------ Australia

Aircraft Hangar (1300M2)------Australia

Warehouse (900M2)----Mongolia

Prefabricated house (70M2)----800sets---Angola

Container house (20')-----60 sets South Africa

Products & Service
We supply completely steel structure building with Design& Engineering service: steel building, space frames, tubular steel
structures, basic building elements(built-up welded H-section, hot-rolled H-section, channel, steel column, steel beam), standard frames, secondary framing, roof &wall materials, tempcon (sandwich) panels window and doors.

Payment Terms:
1) Payment: T/T(30% prepaid as deposit, balance 70% before shipment) or L/C at sight
2) Delivery time: 15~40 days, as pre customers' order
3) Shipment Loading: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk

 

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Hot Products

Introduction of Steel Structure Warehouse Put your manufacturing process in the front seat: As you ...
Introduction of Steel Structure Warehouse Galvanized Girts, Purlins & C-Sections All iBeehive ...
Introduction of Steel Structure Warehouse METAL BUILDINGS, STEEL BUILDING KITS, GARAGES, & WORKSHOPS ...
Introduction of Steel Structure Warehouse Steel structures are preferred because of the advantages ...
Introduction of Steel Structure Warehouse Framing Systems Rigid Frame Clear Span For use where ...
Introduction of Steel Structure Warehouse Framing Systems Rigid Frame Clear Span For use where ...