Home Companies TORICH INTERNATIONAL LIMITED

GB/T19447 TORICH 0.1mm Seamless Copper Pipe

TORICH INTERNATIONAL LIMITED

Contact Us

[China] country

Trade Verify

Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China

Contact name:Richard SHEN

Inquir Now

TORICH INTERNATIONAL LIMITED

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

GB/T19447 TORICH 0.1mm Seamless Copper Pipe

Country/Region china
City & Province ningbo zhejiang
InquireNow

Product Details

GB/T19447 Seamless Copper and Copper Alloy Steel Low Fin Enhanced Evaparation Tube
 
Quick Detail:
The low-finned tube is produced by rolling (three-roll diagonal rolling), and its working principle is as follows:
a mandrel is lined with the smooth tube, the tube material moves in a spiral straight line under the drive of the
roller blade, and finnings are gradually processed on its outer surface through the pass formed by the rolling
groove and mandrel. In order to more conducive to fin forming, used in the process of deformation of rolled
piece in the nip, roll, plastic three stages, make processing of fin complete, smooth, rules, this method produces
finned tube for outside fin tube with is an organic whole, and therefore no contact thermal resistance loss and
corrosion problem, has good heat transfer efficiency and the strong ability of resistance to deformation.

Low Finned Tubes add short fin in the tube wall that greatly increase the surface area over smooth tube.
The fins are formed into the tube wall so the outside diameter of the fins are not larger than the pre-finned
smooth tube.Energy Transfer is solely focused on producing the largest variety and most complete solutions
for finned tubing. Low finned tubes can be provided with a smooth or rifled tube inside surface.
 
Material
C10200, C11000, C70400 C44300 Etc
Size
Fin Thickness: 0.1-2mm; Tube OD: 8-55mm; Length: max 12m
Fin Pitch
Customize
Surface
Copper Coated
End protector
Plain End / Beveled End
Application
Enhanced Evaparation, Oil&Gas Well Drilling, For Heat Exchanger
Test
Tension Test, Flaring Test, Flange Test, Reverse Test, Hardness Test, Hydrostatic or Nondestructive Electric Test

 

 

Plain tube (mm)
Finned section dimensions (mm)
Ratio
De
D×t
Tp
dd
dr
di
η
mm
19×2
0.8
18.8
17
134
2.8
17.9
19×2
1
18.8
16.8
13.4
2.5
17.8
19×2
1.25
18.8
16.6
13
2.2
17.8
19×2
1.5
18.8
16.4
13
2
17.7
19×2
2
18.8
23
13
1.7
17.5
25×2.5
0.8
24.8
22.6
18.8
2.8
23.9
25×2.5
1
24.8
22.3
18.8
2.75
23.7
25×2.5
1.25
24.8
22.3
18
2.5
23.6
25×2.5
1.5
24.8
22.3
18
2.2
23.5
25×2.5
2
24.8
22
18
1.8
23.4
25×2.5
2.5
24.8
22
18
1.6
23.3
D------Outside diameter of plain end section
Dof----Diameter of top fins
Dr-----Root diameter of finned section
Di-----Inside diameter of finned section
T------Wall thickness of plain end section
Tp-----Fin pitch
De----Equivalent diameter of finned tube
L------Plain tube end length
 
Product Show

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

Hot Products

JIS G3445 Carbon steel tubes for machine structural purposes Type: Seamless and welded carbon steel ...
Torich JIS H3300 C1100 Enhanced Condenser Steel Pipes 1.Scope: This standard specifires the wrought ...
Torich JIS H3300 Copper Alloy Seamless Steel Pipe Tubes for Condenser 1.Scope: This standard ...
Seamless Copper Coated Steel Tube Low Finned Tube PRODUCT DESCRIPTION: Keyword: Copper Low Fin Tube ...
Copper Coated Seamless Steel Tube Low Finned Tube PRODUCT DESCRIPTION: Keyword: Copper Low Fin Tube ...
Copper Coated Seamless Low Finned Tube PRODUCT DESCRIPTION: Keyword: Copper Low Fin Tube Material: ...