TORICH INTERNATIONAL LIMITED |
Verified Suppliers
|
|
Thick Wall Seamless Stainless Steel Pipe for Mechanical ASTM A511
TP316 304
Covering seamless stainless tubing foruse in mechanical
applications where corrosion-resistant orhigh temperature strength
is needed.
Covering seamless cold-finished me-chanical tubing and seamless
hot-finis hed mech anical tubing insizes up to 123/4 in.[ 325 mm]
in outside nominal diameter (forround tubing) with wall thicknesses
as required.
Condition:
1.Round seamless stain le ss mechanical tubing is generallysupplied
in the cold-worked and annealed condition (see 5.2through 5.4).
Square, rectangular, or other shapes of tubing aregenerally
supplied annealed prior to final cold shaping. If someother
condition is desired, details shall be included in the order.
2.The thermal treatment for ferritic and martensitic steelsshall be
performed by a method and at a temperature se lectedby the
manufacturer unless otherwise specified by the pur-chaser.
3.Unless otherwise specified. all austenitic tubes shall
befurnished in the annealed condition. The anneal shall consist
ofheating the material to a minimum temperature of 1900 F
Tolerance for seamless stainless tube:
Production Method | Size(mm) | Tolerance | |
Hot Rolling(Extrusion) | OD | ≤140 | ±1.25% |
>140 | ±1.0% | ||
WT | ≤10 | ±12.5% | |
>10 | ±15% | ||
Cold Drawn(Cold Rolled) | OD | 8~30 | ±0.20mm |
>30~50 | ±0.30mm | ||
>50 | ±0.8% | ||
WT | 1.0~3 | +12% -10% | |
>3.0 | ±10% |
Length:
The length or general steel tube:
Hot Rolling(Extrusion) tube: 3~12 m
Cold Drawn(Cold Rolled) tube: 3~8 m
The length for water pipe & boiler steel pipe:
Hot Rolling(Extrusion) tube: 4~12 m
Cold Drawn(Cold Rolled) tube: 4~8 m
Bending tolerance:
WT≤15mm, Bending≤1.5mm/m
WT>15mm, Bending≤2.0mm/m
End shape:
Both ends of the pipe should be cut at right angles, and remove
burrs
Mechanical property:
Heat treatment of longitudinal mechanical properties of steel pipe
shall according to the standard.
Material | Tensile strength MPa ≥ | Yield Strength MPa ≥ | Elongation % ≥ |
0Cr18Ni9 | 520 | 205 | 35 |
1Cr19Ni9 | 520 | 205 | 35 |
0Cr19Ni10 | 480 | 175 | 35 |
1Cr18Ni9Ti | 550 | 205 | 40 |
0Cr18Ni12Mo2Ti | 530 | 205 | 35 |
0Cr26Ni5Mo2 | 590 | 390 | 18 |
1Cr17 | 410 | 245 | 20 |
00Cr27Mo | 410 | 245 | 20 |
1Cr25Ti | 440 | 245 | 17 |
Hardness:
For the tubes which W.T. ≥2 mm, Rockwell hardness tests should be
taken.
Tests of the seamless boiler tubes:
1.Bending Test:
The tubes should take the bending test when OD ≤22mm. The bending
angle is 90 degrees, and the bending radius is 6 times the outer
diameter of the steel tube.
2. Hydraulic test;
Eddy current testing, ultrasonic testing can be used instead of
hydraulic tests. When eddy current testing, GB/T 7735-1995 Gr. A
should be followed; when ultrasonic testing, GB/T 5777-1996 Gr. C8
should be followed.
3. Flattening test
4. Flanging test
5. Expand test
What is your Guarantee?
1.SO9001:2008 and TS16949 certification, SGS, BV, TUV or other
third party inspection is available.
2.High quality with competitive price.
3.Advanced technology, experienced engineer, ISO quality system for
quality assurance and traceability.
Do you have agent or distributor in our country?
1.We are recruiting area agent and distributor all over the world,
welcome to send us your mail or call us for detail discussion.
How is your production capability?
1.2000 tons monthly production capacity, 5000 tons monthly trading
capability
2.Prompt and Timely shipment
How to get the sample?
1.You are requested to pay for sample charges and courier charges
from China to your country; and the free sample is according the
product like size, steel grade and quantity, please consult our
sales for details
2.Sample charges will be refunded when order is placed.
What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation
Who are your customers?
1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users,
etc
How long will you react on our requirement?
1.Your requirement would be treated within 24 hours on weekdays.
Quotations would be sent upon technical details confirmed by
customer!
Any more questions about your doubts, please feel free to send us
your emails or call!