TORICH INTERNATIONAL LIMITED |
Verified Suppliers
|
|
Standard | ASTM A513 |
Size | O.D.:6-350mm W.T.:1-12.5mm L:max12000mm |
Material | 1010,1020,1045,SPHC,SPCC,4130 |
Production | ERW + DOM |
Application | For Machinery, Mechanical Engineer, Automotive Parts,Agricultural. |
Deliver Condition:
1. A.W.H.R. "as welded" from hot-rolled steel
2. A.W.C.R. "as welded" from cold-rolled steel
3. S.D.C.R. "sink-drawn", cold-rolled steel
5. M.D. mandrel drawn
6. S.S.I.D. special smooth inside diameter
Thermal condition:
1. No final thermal treatment
2. Stress relieved
3. Annealed
4. Normalized
Steel Grade | C | Mn | P | S | Si | Cr | Mo |
max | max | max | max | min | |||
1008 | 0.10 | 0.5 | 0.035 | 0.035 | |||
1010 | 0.08-0.13 | 0.30-0.60 | 0.035 | 0.035 | |||
1018 | 0.14-0.20 | 0.30-0.60 | 0.035 | 0.035 | |||
1020 | 0.17-0.23 | 0.30-0.60 | 0.035 | 0.035 | |||
1026 | 0.22-0.28 | 0.60-0.90 | 0.035 | 0.035 | |||
1035 | 0.31-0.38 | 0.60-0.90 | 0.035 | 0.035 | |||
4130 | 0.28-0.33 | 0.40-0.60 | 0.035 | 0.035 | 0.15-0.35 | 0.80-1.10 | 0.08-0.25 |
4140 | 0.38-0.43 | 0.75-1.00 | 0.035 | 0.035 | 0.15-0.35 | 0.80-1.10 | 0.15-0.25 |
Product Show
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring
Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a
perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate
longitudinal and transversal defects.
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and
solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is
30-60 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it
free or extra ?
A: Yes, we could offer the sample for free charge but need pay the
cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Round Aluminized Welded Carbon Steel Tube OD127mm*WT1.5mm for Automotive Parts