Home Companies NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD

JIS G3445 Cold Forming Seamless Mechanical Tubing Precision For Machining

NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD

Contact Us

[China] country

Trade Verify

Address: No.101 Shijing East Road, Tudian Town, Tongxiang, China

Contact name:Denny

Inquir Now

NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

JIS G3445 Cold Forming Seamless Mechanical Tubing Precision For Machining

Country/Region china
Categories Metal Casting Machinery
InquireNow

Product Details

JIS G3445 STKM11A STKM12A STKM13A STKM13C cold forming precision seamless mechanical tubing for machining application

PRODUCT DESCRIPTION
Seamless Steel Pipes
JIS G3445
Steel Grade:STKM11A STKM12A STKM13A STKM13C STKM14B

Product NameSTKM11A steel pipeSTKM12A steel pipeSTKM13A steel pipeSTKM13C steel pipeSTKM14B steel pipe
chemical analysisC:≤0.12;Si:≤0.35;Mn:≤0.60;P:≤0.040; S:≤0.040C:≤0.20;Si:≤0.35;Mn:≤0.60;P:≤0.040; S:≤0.040C:≤0.25;Si:≤0.35;Mn:0.30-0.90;P:0.040;S:0.040C:≤0.25;Si:≤0.35;Mn:0.30-0.90;P:≤0.040;S:≤0.040C:≤0.30;Si:≤0.35; Mn:≤0.30-1.00;P:≤0.040; S:≤0.040
Tensile Strength≥290MPa≥340MPa≥370MPa≥510MPa≥500MPa
Yield strength-≥175MPa≥215MPa≥380MPa≥355MPa
StandardJIS G3445
LengthAs customer's request
PackagingStandard export packing, packed in woven bags, with two nylon slings, or can be customized as request
Heat Treatment/ Delivery Condition
  1. Cold finished (hard) BK(+C)
Tubes do not undergo heat treatment following the final cold forming and, thus, have a rather high resistance to deformation
  1. Cold finished (soft) BKW(+LC)
The final heat treatment is followed by cold drawing involving limited deformation. Appropriate further processing allows a certain degree of cold forming (e.g. bending, expanding)
  1. Cold finished and stress-relieved annealing BKS(+SR)
Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree.
  1. Annealed GBK(+A)
The last Cold forming process is followed by annealing in a controlled atmosphere.
  1. Normalized NBK(+N)
The last cold forming process is followed by annealing above the upper transformation point in a controlled atmosphere.
Delivery TimeWithin 35-50 days from receiving deposit
Payment Term100% L/C at sight or 30% deposit, 70% balance against copy of B/L
Usage/ApplicationPipes for automobile and motorcycle
Main MarketAsia, Middle East, Europe, etc.

 

Hot Products

EN10305-4 Precision Steel Tube Seamless cold drawn tubes for hydraulic and pneumatic power systems​ ...
3Cr13 2Cr13 1Cr13 Bearing seamless steel tube Quick info: Material 3Cr13 2Cr13 1Cr13 OD 4-440mm WT 2...
Hydraulic Cylinder steel tubes and pipes EN10305-1 E355 St52 16Mn Standard : GB/T3639, GB/T8713, ...
Precision Steel Tube EN10305-1 Seamless Cold Rolling Steel Tubes for Hydraulic Systems Quick Detail: ...
Precision Seamless Cold Drawn Steel Tubes GOST9567 Mechanical Steel Tubing GOST9567 Steel Tubes...
EN10305-1 E235 E355 +SRA +N Cold Drawn Seamless Precision Steel Tube for Precision Application Tubes ...