Home Companies Hebei Zexu Pipe Manufacturing Co., Ltd.

5mm Target Plate For Steam Blowing Steam Purging Aluminum Sputtering

Hebei Zexu Pipe Manufacturing Co., Ltd.
Active Member

Contact Us

[China] country

Address: Yanshan County, Cangzhou City, Hebei Province

Contact name:Manager Zhao

Inquir Now

Hebei Zexu Pipe Manufacturing Co., Ltd.

5mm Target Plate For Steam Blowing Steam Purging Aluminum Sputtering

Country/Region china
City & Province cangzhou hebei
Categories Aluminum Sheets
InquireNow

Product Details

The aluminum target plate for purging is specially produced and processed by Hebei Longxu Company. The aluminum target plate is used in the purging experiment.

After the pipeline system is installed, air or steam can be used to blow it according to the working conditions of its working medium and the degree of contamination of the inner surface of the pipeline. The general requirements for pipe purging are:

Equipment and pipelines that do not allow purging should be isolated from the purging system.

Before the pipeline is purged, the orifice plate, flange-connected regulating valve, main valve, throttle valve, safety valve, instrument, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be adopted or the seal should be removed. protection measures, etc.

The order of purging should be carried out in the order of main pipe, branch pipe, and dredging pipe.

The dirt discharged by purging shall not pollute the environment, and it is strictly forbidden to discharge it at will.

A forbidden area should be set before purging.

No other operations that affect the cleaning shall be performed after the pipeline has been purged qualified.

The aluminum target plate for sweeping experiments, the specifications and models are customized according to customer needs, Longxu Company is the first to produce aluminum target plates, ***, ***,

1. After the strength test of the pipeline system, before the air pressure tightness test, purging and cleaning should be carried out in sections

2. The purging method should be determined according to the use requirements of the pipeline, the working medium and the degree of dirt on the inner surface of the pipeline. Liquid or gas pipelines with a nominal diameter greater than or equal to 600mm should be cleaned manually, and liquid pipelines with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, it should be purged with air. Steam piping should be purged with steam, and non-thermal piping should not be purged with steam. The purging of the gas is generally carried out in sequence by the main pipe, the branch pipe, and the dredging pipe.

3. Before the pipeline is flushed, a detailed flushing plan should be prepared and carried out according to the system section.

4. Equipment and pipelines that are not allowed to be purged are separated from the purge system.

5. After the pipeline cleaning is qualified, in addition to the specified inspection and recovery work, no other work that affects the cleaning of the pipe shall be performed, and the "Pipeline System Blowing Record" shall be filled out.

 

Hot Products

The aluminum target plate for purging is specially produced and processed by Hebei Longxu Company. ...
Professional Production And Processing Of Various Types Of Steam Blowing Aluminum Target Plate The ...
SUS304L SUS316L Stainless Steel Shaped Elbow GB/T10752-2005 Elbow Fittings The application field of ...
Pipe Fittings Hastelloy C276 Nickel Alloy Long Radius Seamless 1''-24'' SCH 40 1.5D 90 Degree Elbow ...
High Quality DN15-DN800 Stainless Steel 304 316L 90 Degree 45 Degree Elbow Pipe Fittings Stainless ...
INCONEL ALLOY 625 ASME B16.9 Fittings 1-24 Inch INCONEL 625 Pipe Fittings Tees Seamless Or Weld ...