Home Companies Guangdong Bunge Building Material Industrial Co., Ltd

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended

Guangdong Bunge Building Material Industrial Co., Ltd

Contact Us

[China] country

Trade Verify

Address: No. 5-37, Fengxi 2nd Road, Hailong Street, Liwan District, Guangzhou, China

Contact name:Buffy

Inquir Now

Guangdong Bunge Building Material Industrial Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended

Country/Region china
City & Province guangzhou guangdong
InquireNow

Product Details

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended

 

Details of Movable Partition Walls

 

1. Movable partition wall is exclusively used as the facade of the separation in the interior space, its' application is more flexible, it usually produce the blocking effect, generally don't do it under the board, some of it even can move.The biggest difference between partition and wall is that a partition is made under the plate, that is to say, the height of the facade is different.

2. The operate method of scalability fully embody the people-oriented concept, flexible tactile touch, spring operation became more safe and durable.

 

3. Overhead type track, you just need to install the orbit on the floor or on the rack, there is no track on the floor, have no damage on the ground.

4. Unique aluminium materials ,which can be used for painting.

5.  It is convenient to collect,plate can be hide in special coffer, have no effect to the whole appearance.

6.  It is widely used for many occasions.

 

The Installing Procedure of Movable Partition Walls

 

1. Please designate the responsible person before construction and leave contact information to facilitate communication between the two parties on construction logistics.

 

2. If the ground has been finished before the track construction, if the carpet, floor tiles, floor, etc. have been laid, you need to do ground protection to prevent the welding sparks from damaging the ground.

 

3. You need to provide the height of the shed after the decoration is completed. We will determine the height of the track installation according to this height.

 

4. Because we need to calculate the size of the hanging track, you need to provide the net size of the finished wall and the pillar. We will hang the track according to this size.

 

5. After the track suspension is completed, the reserved wall size given by you cannot be changed. Because we calculate the construction according to this size, if the size is changed, the door panel will not operate.

 

6. After the track suspension is completed, our construction personnel will fill in the dimensional confirmation letter to provide accurate data for the production of the wallboard. You need to specify the person in charge of the site to confirm.

 

7. The movable partition walls should be horizontally perpendicular to the ground directly below the track, and the error should not exceed 1cm.

 

8. If there are other constructions at the same time, please do not pierce the foreign objects such as nails and insert them on the installed rails. This will cause the door pulleys to not run in the track.

 

9. Each group of tracks will have a “raw mouth”, which will be removed before installing the door panel, and then installed after the door panel is installed. This "raw mouth" cannot be sealed.

 

10. In order to facilitate future maintenance and maintenance, please reserve the inspection port near the ceiling track to facilitate the maintenance personnel to enter the inspection port for product maintenance and maintenance.

 

11. If you need to improve the sound insulation effect of the product, after the track is hung, you can make sound insulation between the track and the original shed.

 

12. After the door panel is hung, it needs to be debugged. Active partition reminder Do not use the door panel before our personnel have debugged the door panel, otherwise forcible use will result in damage to the door panel.

 

Technical Details of Movable Partition Walls:

 

SeriesBG65BG80 / BG85BG100 & BG125
Panel suspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness65mm80mm / 85mm100mm
Panel heightUp to 4000mmUp to 6000mmUp to 18000mm
Max height4000mm6000mm18000mm
Panel width600-1230mm600-1230mm600-1230mm
Frame constructionAluminum frameAluminum frameAluminum frame
Face material9mm9mm / 12mm12mm
Fire safetyOptional Class I or OOptional Class I or OOptional Class I or O
Vertical profilesAluminum anodised with sealing profilesAluminum anodised with sealing profilesAluminum anodised with sealing profiles
Retractable sealsAluminum black with
double rubber seals
Aluminum black with double rubber sealsAluminum black with double rubber seals
Operation of sealsManual, with supplied
operating handle
Manual, with supplied operating handleManual, with supplied operating handle
LockingOptional lock to pass doorsOptional lock to pass doorsOptional lock to pass doors
Pass doorsSingle open in panel or
double open in two panel
Single open in panel or double open in two panelSingle open in panel or double open in two panel
Sound insulation32-38dB Rw36-45dB Rw42-55dB Rw
WeightApprox 22-35kg/sq MApprox 25-40kg/sq MApprox30-48kg/sq M

Construction Method of Movable Partition Walls


1.Track installation:Suspension fixed way is at the top of the movable partition walls board install the hanging wheel, and connected to the track suspension. The track and hanging wheel should be chosen according to the partition size and load weight.

2.Movable partition walls panel installation: according to the design drawing, draw on each partition panel to mark the line wheel, fix the wheel with screws on the partition board top; Then the panel be put into track, let each panel in the perpendicular to the ground; Test and push-pull flexible rotation, and finally to fixed connection.

3.Debugging: Movable partition walls need to discretion, sealing and so on debugging after installed. Then cleaning up the panel, complete the installation work

Hot Products

Suspended System Operable Acoustic Movable Partition Wall for Banquet Hall Nice Price of Movable ...
Meeting Room Commercial Operable Partition Movable Walls for Classroom FAQ of Movable Walls 1. Are ...
Sliding Door Hanging Rollers Aluminium Track Roller Restaurant Movable Partition Wall Description: ...
Sliding Hanging System Track Soundproof Room Divider Office Movable Partition Wall Description: ...
Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended Details of Movable ...
Flexible System Leather SurfaceAluminium Track Sliding Roller Conference Room Movable Partition Wall ...