Home Companies TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD

Real Time Control IP55 R143A Small Cabinet Air Conditioner

TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD

Contact Us

[China] country

Trade Verify

Address: 3A-8, No. 111, Taizi Road, Shuiwan Community, Zhaoshang Street, Nanshan District, Shenzhen, Guangdong, China

Contact name:Fiona Liang

Inquir Now

TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Real Time Control IP55 R143A Small Cabinet Air Conditioner

Country/Region china
City & Province shenzhen guangdong
Categories Toilet Tissue
InquireNow

Product Details

 

220VAC 50Hz 500W Cooling Capacity Cabinet Air Conditioner R143A

 

1. Air Conditioner Instructions

 

This series AC air conditioner is a temperature control product manufactured by using high performance air conditioning technology and quality standards. It is specially designed for cooling outdoor areas / spaces such as communication cabinets, machining, automation systems, advertising machines, etc

 

2. Technical Parameter

  1. 2*16 Chinese/English shift LCD display, user friendly;
  2. Simultaneously display temperature and humidity inside the box and communication room temperature;
  3. Temperature measurement accuracy: 0.1 °C; humidity measurement accuracy:5%;
  4. Can store 180 days’ daily event record, 1 record every day;

  5. RS485 communication, YD/T 1363.1-2005 standard protocol, support remote detection and control;

  6. Control mode: pulse (Non dry contact air conditioner), conducting (dry contact air conditioner)

  7. Real-time control air conditioner on/off

  8. Power supply: AC185V~264V/50HZ;

  9. Power consumption:≤5W;

  10. Working environment: -30°C~70°C; <90%RH;

  11. Installation method: guide rail,hanging;

3.Air Conditoner Dimensions

 

4. Maintenance

 

4.1 Maintenance Tools:

  1. Vacuum cleaner or compressed air cleaning agent

  2. Soft brush

  3. Cross screwdriver

  4. Clamp meter

  5. Digital thermometer

4.2 Maintenance Steps:

  1. Turn off the power.

  2. Disconnect the power line, and disconnect the signal line.

  3. Conduct maintenance according to the “Maintenance Table”.

  4. Connect the power line and signal line.

  5. Operating testing program.

  6. Disconnect the power, restore the normal operating status.

  7. Connect the power.

  8. The equipment installation should reserve a maintenance space not less than 300mm.

Hot Products

Anti theft Outdoor Electronic Equipment Enclosures Three Compartment Double Wall Three Compartment ...
1 Compartment IP55 Outdoor Telecom Cabinet 0.5mm Galvanized Steel 1. Application It is designed for ...
1200W 220V Telecom Street Cabinets Anti Corrosion Equipment Enclosure 1. Outdoor Equipment Enclosure ...
35u Rack Environment Monitoring Unit DC48V Fans Outdoor Telecom Enclosure 1. Description Of Outdoor ...
UPS PDU Anti Theft Outdoor Telecom Cabinet 600W Air Conditioner 1. Description Of Outdoor cabinet ...
Two Compartments Outdoor Telecom Cabinet 30U 19" Rack For Base Station 1. Description Of Outdoor ...