Home Companies HANGZHOU SPECIAL AUTOMOBILE CO.,LTD

Special Manufacturer of 22 m Under Bridge Inspection Truck with high quality

HANGZHOU SPECIAL AUTOMOBILE CO.,LTD
Active Member

Contact Us

[China] country

Address: M20-15-1, Hangzhou economic and technological development Area, Hangzhou, China.

Contact name:Serena Liu

Inquir Now

HANGZHOU SPECIAL AUTOMOBILE CO.,LTD

Special Manufacturer of 22 m Under Bridge Inspection Truck with high quality

Country/Region china
City & Province hangzhou zhejiang
Categories Work Platforms
InquireNow

Product Details

 

platform type under bridge inspection truck from HSA

 

This bridge inspection truck  provides a working platform during the detection process and can be equipped with bridge detection equipment for mobile inspection or maintenance for bridge inspection person.

 

 

Bridge Inspection and Repair

 

Bridge repair projects are necessary to correct structural or functional deficiencies, vehicular collision damage, concrete or steel deterioration, scour problems, etceteras.

 

The Bridge Repair Section is responsible for the design and plans preparation of bridge repair projects on state maintained bridges. Plans are developed by both in-house staff and consultant firms, which are under contract with the Department.

 

Repair projects are let to contract through the normal bid process and administered by the Construction Office. During the construction phase, the repair section assists region construction personnel in construction inspection and in solving any problems that may arise.

 

The Bridge Repair Section provides assistance in the following areas:

 

Provides recommendations and assistance to state bridge repair crews in making routine maintenance type repairs

Works with Materials and Tests personnel with installation and evaluation of new products developed or proposed for repair work

Develops projects for maintenance painting of steel structures (This duty also involves evaluating new paint systems and developing specifications for painting projects.)

 

Makes recommendations and provides details for bridge repairs on bridges included in the limits of roadway resurfacing projects


 
It ensures that the staff can be quickly and safely transported to every inspection part of the bridge, including any positions on the bridge, under bridge, bridge pier, etc.
 
Idea for all under-bridge project: inspections, repairs, stripping operations, painting and sandblasting, general underbridge maintenance, bearing replacement, installation and replacement of under-bridge pipelines and cables.

  1. Specifications:
Structure type of bridge inspection vehiclePlatform type
Max. Horizontal working range22M (72’)
Max. vertical working depth8000mm (26’)
Width of work platform1080mm
Max. load on Truss platform800KG (1763lb)
Max. load on telescopic Truss platform400KG(881lb)
Max. Width of sidewalk spanning3000mm (9.8’)
Max. height of guardrail spanning4400mm (14.5’)
The 1st rotation angle scope0~90°
The 2nd rotation angle scope0~1800
Max. amble travelling speed15m/min
Operation ModeWireless Remoter , Panel, Emergency manual
Drive systemTwo drive system: PTO and gasoline generator
Amble self travelling deviceTransfer case instead of amble motor
ChassisVolvo FM420 84RB
G.V.W31000KG
Overall dimensions12560(L)×2500(W)×4000 (H)mm

 
 

2. Competitive Advantage:

  • Matured Technology    

Innovation design with dozens of patents, rich experience with over 100 units annual production.
to ensure the technology and performance of vehicle in the world first class level.
 

  • Optimization Chassis

Adopted imported Scania chassis, 310KW large engine power, huge carrying capacity, good stability, economic environment and the luxurious cab, especially for long-time work.

  • Reliable Performance

The key parts of the hydraulic system, electrical system and control system all adapts imported well-known brand components, with stable and reliable performance,, ensure the fast reaction and stable performance.

  • Light weight design

Main structure parts made of imported high-strength steel with advanced welding procedure makes sure the Truss light with more loading capacity.
 

  • High Working Efficiently

Good capabilities of high-span and wide-span underbridge working range, suitable for different operating conditions
Self-propelled ability during operation, max. moving speed 15m/min
 
fast  reaction on extent and retract during under bridge work, and the vehicle deploy time is only 4 -8 minutes.

 

 

3. Market

 

We HSA, China leading BIU manufacturer and main supplier in Asia market. (large export to South Korea, Vietnam, Malaysia, Indonesia, Maldives, Brunei et)

 

 

4. MBIU working video

 

Platform type MBIU: https://www.youtube.com/watch?v=IyyTuEgFubo&feature=youtu.be

 

Bucket type: https://www.youtube.com/watch?v=dXxARhbfV8I&feature=youtu.be


 

Hot Products

Our Bucket type bridge Insepction vehicle is equipped with DongFeng chassis, a famous national brand...
22 M Bucket Type Bridge Inspection Vehicle For Big Cable Bridges(HZZ5311JQJ) The Bridge Inspection ...
22 M Bucket Type Bridge Inspection Vehicle For Big Cable Bridges(HZZ5311JQJ) With increasing numbers ...
18m Howo Bucket Type Bridge Inspection Vehicle (HZZ5311JQJ18) Our Bucket type bridge Insepction ...
18m Howo Bucket Type Bridge Inspection Vehicle (HZZ5311JQJ18) our bridge inspection and maintenance ...
18m Howo Bucket Type Bridge Inspection Truck Working Basket (HZZ5311JQJ18) Road bridges carrying ...