Home Companies Hebei Pantu Machinery Equipment Co., Ltd

16 Inch Kill Manifold 15000psi Stainless Steel Oil And Gas Manifold

Hebei Pantu Machinery Equipment Co., Ltd

Contact Us

[China] country

Trade Verify

Address: Xinhua District, Cangzhou City, Hebei Province, China

Contact name:Peter

Inquir Now

Hebei Pantu Machinery Equipment Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

16 Inch Kill Manifold 15000psi Stainless Steel Oil And Gas Manifold

Country/Region china
City & Province cangzhou hebei
Categories Valves
InquireNow

Product Details

4 1/16 Inch 15000psi Choke Manifold In Oil / Gas Well

 

Main parameters

 

One end of the device connects with the side flange of the BOP spool. When BOP closes, it can control the finite pressure from the casing by adjusting the choke valve's opening, so balanced drilling can work under minimum pressure difference.

 

Choke Manifold Parameter

 

TypeWorking pressureMain bore diaBy-pass dia.Remarks
(psi)On.)(In.)
YG140200004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 1/16" 2 9/16"Different types of combinations can be provided according to requirements
YG105150004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 9/16" 2 1/16"
YG70100004 1/16" 3 1/16" 2 9/16" 2 1/16"4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG3550004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG2130004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"

 

Configuration


The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges, and other components.

 

Choke Manifold Working Principles


When the pressure inside the well rises, opening/closing the choke valves(including manual chokes, hydraulic chokes, and positive chokes)on the choke manifold can allow the release of the fluid inside the well to control casing pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.
4. Pressure Ratings
The kill manifold is available in pressure ratings of 2000psi,3000psi,5000psi,10000psi, and 15000psi, and also can be available upon customer request.

 

Operating Instructions


(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under low-temperature conditions.

 

Hot Products

F800 Single Acting Drilling Mud Pump Compact Structure High Pressure Introduction Drilling Mud Pump ...
F1600 Drilling Mud Pump API Spec 7K Standard F1600 Drilling Mud Pump is manufactured under the ...
F1600HL 1600 HP Drilling Mud Pump High Pressure 7500 Psi F1600HL Drilling Mud Pump High Pressure ...
4 1/16 Inch 5000psi Kill Manifold Drilling Rig Spare Parts Kill Manifold is mainly composed of a one...
3 1/8 Inch 5000psi Choke Kill Manifold Oil Gas Control Manifold When the wellhead pressure rises, ...
2 1/16" 5000psi Choke Kill Manifold Well Control System As the wellhead pressure increases, the ...