Home Companies Sanyuan Yinda Petroleum Machinery Co.,Ltd

BOMCO Mud Pump Pinion Shaft AH1301010300 AH37001-02.00 4340 Alloy Steel

Sanyuan Yinda Petroleum Machinery Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: In The Western Suburbs Of Sanyuan County, Xianyang, Shaanxi, China

Contact name:Rita

Inquir Now

Sanyuan Yinda Petroleum Machinery Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

BOMCO Mud Pump Pinion Shaft AH1301010300 AH37001-02.00 4340 Alloy Steel

Country/Region china
City & Province xianyang Shaanxi
Categories Shafts
InquireNow

Product Details

BOMCO mud pump pinion shaft,AH1301010300,AH36001-03.00,AH1601010200,AH37001-02.00,AH0801010300,AH1001010300

 

 

A rod containing the pinion designed to transfer motive power from the prime mover to the crankshaft via the pinion and main gear.Also known as the Pinion Shaft.

 

The external input shaft of certain gear operators, which drives the internal reduction gearing. The pinion shaft can accept a hand wheel or power operator.

 

pinion shaft is made of 4340 alloy steel through forging process. With great precision, the double helical gear machined on the shaft will ensure smooth power transmission along the whole tooth width and reduce gear gap significantly. As a result, hammering caused by change of speed will be efficiently eliminated.

 

 

How to Install the Pinion Shaft & Bearings?

 

1. Install the pinion bearing inner races on the pinion shaft by heating to 300°F in an oil bath, electric oven or induction bearing heater. Wait for races to cool before proceeding.

2. Install the pinion bearing outer races to the bearing carriers using a slip fit.

3. Place the pinion shaft into the pump before installing the bearing carrier assemblies. Make sure the pinion shaft is properly supported before proceeding.

4. Slide the bearing carrier assemblies and gaskets over the pinion shaft and into the pump frame, exercising caution as they meet the inner race.

5. Install the pinion oil seal and race onto the pinion shaft.

 

How to Remove the Pinion Shaft?

 

1. If necessary, unscrew and remove the key from the pinion shaft keyway.

2. Disconnect the oil lube lines and drain, then unbolt the pinion oil seal plate. Be sure to support the pinion shaft to prevent it from moving.

3. Slide the oil seal plate and spacer free of the pinion shaft.

4. Remove the pinion oil seal and race from the pinion shaft.

5. Unscrew and remove the bolts and washers securing the pinion bearing carrier to the power frame.

6. Use the jackscrew holes in the pinion bearing carrier and remove it and the spacer from the power frame.

7. Remove the bearing outer race and rollers from the pinion bearing carrier. The bearing inner race will still be shrunk fit onto the pinion shaft, and it is important to protect the finish of the inner race if the bearing is to be reused.

 

BOMCO mud pump pinion shaft,AH1301010300,AH36001-03.00,AH1601010200,AH37001-02.00,AH0801010300,AH1001010300

 

 

Mud Pump Parts Model We Can Do

 

BOMCO

F-500

F-800

F-1000

F-1300

F-1600

F-1600HL

F-1600L

F-2200HL

Hong Hua

HHF-500

HHF-800

HHF-1300

HHF-1600

3NB-1600F

5NB-1600

5NB-2400

 

HRSBRSF-1300RSF-1600     

 

RG

RGF-800RGF-1000RGF-1300RGF-1600   

 

Lanzhou

3NB1000C

3NB1300C

3NB1600F

3NB1600L

 

 

 

 

EMSCO

F-500

F-800

F-1000

F-1300

F-1600

FD-1000

FC-2200

FB-1300

Gardner Denver

PAH

P7

P8/9

P10/11

 

 

 

 

National

7-P-50

8-P-80

9-P-100

10-P-130

12-P-160

14-P-200

14-P-220

 

Oilwell

A-850-PT

A-1100-PT

A-1400-PT

A-1700-PT

 

 

 

 

TSC

WF-500

WF-800

WF-1000

WF-1300

WF-1600

WF-2000

WF-2200

 

IDECO

T-500

T-800

T-1000

T-1300

T-1600

 

 

 

RUSSIA

UNBT-1180L

UNBT-950A

UNB-600

 

 

 

 

 

 

FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you? 
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.

3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

 

More customer view:65-MK Valve and seat-yindapump.com.pdf

Hot Products

Oil Seal 9.125″ ×10.375″×0.625″, Pinion Shaft AH36001-03.08A AH36001-03.08A Mud pump oil seal is the ...
Bearing 4G32844H, Pinion Shaft AH36001-03.09 AH36001-03.09 ZB-8662 ZB-10236 NB800M.03.13 NU3036X2M...
Weatherford Mud Pump Crosshead, PN908399, 908368, 1244632 mud pumps for drilling rigs The material ...
RGF Mud Pump Crosshead, RGF1300-04-00, RGF800-04.00, RGF1000-04.00 mud pumps for drilling rigs ...
Bomco Mud Pump Crosshead, AH36001-04.01A, AH1301010401,AH0501020401 AH0801020401, AH1001020401, ...
HONGHUA Mud Pump Crosshead, GH3161-04.01, NB100.04.01, GH3101-04.01, NB101.04.01, NB104.04.01, ...