Jiangyin Dingbo Technology CO., Ltd. |
|
CZ purlin interchangeable roll forming machine
Product Description
The purlins are now commonly used in the construction industry,
with different shapes and sizes, the most commonly used are C
purlin and Z purlin. Dingbo's purlin forming machine can produce
both C and Z products on the same machine. It only takes 40 minutes
to change between C and Z. In addition, the purlin machine can
produce sizes between 100 and 300, easy to adjust, in just ten
minutes.
What's important is that our purlins can be designed with a punching device and a punched hole in the punch that can be tightened during installation.
Profile drawing
Working Flow
Decoiler --- Servo Feeding ---Pre-Punching--- Levelling--- Roll
Forming ---- Cutting ---- Run out table
Technical Data
Items | Specifications | |
Material of coil | Purlin Width | 100mm-300mm |
Purlin Height | 40-80mm | |
Material Thickness | 1.5-3mm | |
Uncoiler | 5 tons manual | |
Leveling | 7Rollers | 3upper rollers, 4 lower rollers |
Hydraulic system | Hydraulic Power | 5.5kw |
Punching | Hydraulic pre-punching | |
Punching mould material | Cr12Mov | |
Cutting | Hydraulic pre-cutting | |
Blade Material | Cr12Mov | |
Tolerance | +-1.5mm | |
Forming system | Rolling Speed | 10-15m/min |
Roller Stations | 16 stations | |
Roller Material | Gcr15 quenched,hardness 55-58° | |
Shaft material | 45#steel | |
Main Motor Power | 18.5kw | |
Way Of Drive | chain | |
Electrical control system | Electric Source | 380V, 50HZ,3 phase(customized) |
PLC Control System | Panasonic |
Main Items
No. | Name | Qty |
1 | Manual Uncoiler | 1 |
2 | Main Roll Forming Machine | 1 |
3 | Cutting Device | 1 |
4 | PLC Control Box | 1 |
5 | Hydraulic Pump Station | 1 |
Machine picture
Product and Use
Package&Delivery
Customer visit
Sample room
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful
installation and commissioning of the equipment at the Buyer’s
Installation site. During which all parts damaged because of
quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install
and operate is provided face to face. If not, manual and video is
provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do
installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing,
commission and training. The buyer has to pay USD100/per day and
visa fee, air tickets fee, accommodation and food, necessary
communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians
available to maintain the machine overseas to customers’ workshop
if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days
after receiving deposit. Some machines in stock, can be delivered
at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and
profile drawing you provide. Our engineers can offer the best
professional solution to our worldwide clients.
7. Q: How to visit your factory?
We are in jiangyin city,belongs to Jiangsu province,
near Shanghai. If you arrive at Shanghai Airport,we can pick you up
It is 160 kilometers from Pudong Airport, about 3 hours.
It's 110 kilometers from Hongqiao airport, about 2 hours; It's 125
kilometers from downtown Shanghai about two and a half hours.
It is very convenient.Please let me know if you have booked the
tickets
so that I can prepare and book a hotel for you,we will arrange for
car to pick you up.
By high speed train from Shanghai to East Wuxi (Wuxi Dong station),
half an hour.
8. Q: How to place order ?
Inquiry---confirm the profile drawings and technical specification
and price----confirm the PI---arrange the deposit or L/C---start
production-- do inspection--- Shipment
9. What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the
successful inspection at seller’s workshop, and before delivery.