Home Companies Guangzhou Tendars Tent Co., Limited

Large Water Proof Pvc Party Marquee Tents House Marquee Birthday Party Marquee Tents To Buy

Guangzhou Tendars Tent Co., Limited

Contact Us

[China] country

Trade Verify

Address: Room 904, No. 6, Hanxing 3rd Street, Zhongcun Street, Guangzhou, Guangdong, China

Contact name:Amanda Chan

Inquir Now

Guangzhou Tendars Tent Co., Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Large Water Proof Pvc Party Marquee Tents House Marquee Birthday Party Marquee Tents To Buy

Country/Region china
City & Province guangzhou guangdong
Categories Stone Carving and Sculpture
InquireNow

Product Details

 

 

Large Water Proof Pvc Party Marquee Tents House Marquee Birthday Party Marquee Tents To Buy

 

Product Specification:

 

1) Span Width: 3m, 6m, 8m, 9m, 10m,12m, 15m,1 8m, 20m, 21m, 25m, 30m, 40m, 45m, 50m, 55m, 60m
2) Length: unlimited and can be extended by 3m or 5m.
3) Eave height: 2.5m, 3m, 4m, 5m or special height per requested
 
 

 

Customizable Information
 
Tent roof optional
Transparent cover, white cover ; red color, green color.other color option
Tent Wall optional
PVC plain wall,PVC wall with clear windows,PVC clear wall, glass wall, Sandwich walls, plastic solid wall
Tent Door optional
glass door,sliding door, folding door, solid door
Tent floor optional
Wooden floor with plastic base, cassette wooden floor
Tent fixation optional
Expand screw, ground stake, weight plate
Tent decoration
Roof lining, sidewall drapery
Other option
lighting,rain gutter, carpettables, and chairs,air-conditioner

 

 

Building steps of the tent:

 

The first step: building site lofting and fixed base according to the specifications of the tent used, the size of the overall tent building layout. First of all, the layout is carried out in the construction site, and all the base chassis must be in a horizontal line. Confirm the position of all the bases and fix the bases after confirmation! (Note: The construction site must not have buildings and vegetation that hinder the construction.)

 

Step 2: Place the materials. Refer to the installation instructions, and place the materials of each part at the joint of the corresponding assembly according to the connection relationship and construction position of each part.

 

The third step: Composite frame

1, ridge connection Angle and diagonal beam installation: insert the ridge connection Angle into the left and right diagonal beam, and then tighten with bolts

2, bearing column and diagonal beam installation: the bearing column and diagonal beam assembly and alignment holes, tighten with bolts

3, bearing column and base installation: The pin holes of the bearing column built-in parts are aligned and inserted into the cylindrical pins, and then locked with the opening lock, and so on, both sides of the corresponding connection to complete

 

The installation of the fourth step: erect the frame to install the two lifting belts respectively on the inclined beam, with traction equipment (such as: Crane) through the correct and safe link between the traction shrink and the inclined beam, erect the first set of frames, and the other side must have a backpull rope to prevent excessive traction and anti-tipping. (Note: When the first set of frames are erected, it must be fixed with a cross brace)

 

Step 5: Install the eaves and roof square pipes. Hang one end of the bend hook of the eaves square pipe into the corresponding U-buckle of the already erected frame, and then lift the other end into the corresponding U-buckle with a fork rod (note: the left and right sides should be carried out in correspondence), and then hang all eaves and roof square pipes in the same way.

 

Step 6: Install the gable middle column and side column. Align the inside of the right Angle of the gable middle column with the cylindrical hole on the connecting Angle of the roof ridge, and link it with bolts.

 

The bottom end should be connected to the base, locked with a cylindrical pin, and then install the focus column in the same way (note: the base is not fixed first). After installation, adjust the middle and side columns according to the flatness of the construction site, and then fix the base when maintaining a stable state of parallel!

 

 

 

 

 

Requirement:

 

---------------------------------------------------------------------------------------------------

 

1. Width__________M

 

2. Length________M

 

3. Space distance between columns:________M

 

4. Eave high__________M

 

 

 

 

 

RFQ :

 

 

1: Are you a trading company or manufacturer?

We are manufacturer, so we can give you competitive prices.

 
2: What are the types of tent?
Have herringbone tent pagoda tent dome tent, etc
 
3: How many people can a tent hold?
Usually one square meter can hold a person
 
4: Can you develop products with our drawing?
Yes, please offer your drawing with technical requirements
 

Hot Products

Outdoor Heavy Duty Wedding Marquee Tents UV Proof Wind Resistance Outdoor Wedding In Tent Product ...
Infinite Extension Wedding Marquee Tents Outdoor Wedding Shelter Average Cost Of Tent Wedding ...
Aluminum Frame Banquet Clear Wedding Tent With Lights 2000 Seater Multi Purpose Cheap Outdoor ...
Large Outdoor Wedding Marquee Tent Clear Span 30m For Party UV Resistant Outdoor Wedding Ceremony ...
1000 Capacity Marquee Party Event House Tent Fame Retardant DIN4102 Big Outdoor Wedding Tents ...
Clear Span PVC Fabric Party Banquet Tent With Drapery Tent Wedding White Wedding Tent Amazon Product ...