Home Companies Advanced Instruments Co.,Limited

Transformer Electrical Test Instrument OLTC On Load Tap Changer With USB

Advanced Instruments Co.,Limited

Contact Us

[China] country

Trade Verify

Address: Hi-tech Developing Industrial Area, Liuyang City,Changsha,Hunan Province,China

Contact name:Sandy

Inquir Now

Advanced Instruments Co.,Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Transformer Electrical Test Instrument OLTC On Load Tap Changer With USB

Country/Region china
City & Province changsha hunan
InquireNow

Product Details

Transformer On-load Tap Changer Test Instrument

 

I. Introduction:

The on load tap changer test instrument can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.

 

II.Main Features

1. Test transformers of type Y0 Y Δ and display resistance value directly;
2. Automatically analyze waveform fault and mark the fault;
3. Automatically adjust resistance value and time range according to sampling data;
4.Transformer type Δ is able to display to synchronization status of three phase;
5. The OLTC test instrument is able to test with winding or without winding;
6. Four terminal connection mode and provide high accuracy of resistance measurement.
7. Continuous test to save time of power off
8. This on load tap changer test instrument can produce word report
9. 800×480 colorized LCD with touch screen and high speed printer are designed with OLTC on load tap changer tester.
10. Store 1000 groups of data and also can be saved by USB flash disk.

 

III. Specifications:

1Three phase constant current source charge,charge current3A/1A; 0.6A/0.2A
2Maximum voltage of the port24V
3Maximum range of transition resistance100Ω
4Measuring range1A:0.4Ω~20Ω 0.2A:10Ω~100Ω
5Record time of waveform300ms
6Sample rate30K
7Resolution of time0.1ms
8Resolution of resistance0.1Ω
9Accuracy of transition resistance±5% Reading±0.1Ω
10Accuracy of transient time±0.5% Reading±0.2mS
11Temperature

-10-40°C Humidity: <85%RH

 

IV.Accessories List

Test cable

Ground cable

Power cable

The mouse

U flash disk with PC software

 

V.Opeation introduction

①.The winding of transformer could be connected in the test circuit but all the external power source should be removed before make connection with the tester and sample transformer.

②.No testing windings of transformer should be short connected to the earth grounding while the terminal O shouldn’t be connected to the earth grounding;

③. If the tap changer hasn’t been operated for a long time Please clean the oxid layer and impurity by move the tap changer multi times.

④. Please be sure that the tester has been connect to the earth grounding reliable before run the tester.

⑤. Please don’t measure more than two groups of test line in one group measurement;

⑥. It’s forbidden to cut off the test connection when tester running.

⑦.Please turn off the tester first and then remove the test connections.

 

VI.Sample test result:

 T0(ms)T1(ms)T2(ms)T3(ms)T4(ms)R0(Ω)R1(Ω)R2(Ω)
A phase0.019.95.119.944.90.85.15.0
B phase0.019.95.119.944.90.85.05.0
C phase0.019.95.119.944.90.95.05.0

Hot Products

ISO9239 FRPT.pdf Introduction: Critical Radiant Flux is the main parameters of the fire risk for ...
Introduction This Fire Test Equipment is developed base on the standard AS1530.2, test for ...
Introduction: The BS 476-12 Ignitability Tester is designed according to the BS476-12:1991. Method ...
Product Introduction The smoke toxicity test device (squirrel cage method) is applicable to the GB/T ...
Roofing Fire Test Equipment with Burning Brands by ENV 1187 Test 1 and ISO 12468-1 Product ...
Product Introduction Smoldering characteristic test furnace is mainly used in the fire performance ...