Home Companies Wuxi Yushun Metallurgical Technology Co., Ltd.

150T MT LRF Steel Making For Refining Molten Steel

Wuxi Yushun Metallurgical Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Room1905, No.251, Huipu Financial Building, Tongyang South Road, Liangxi District, Wuxi City, Jiangsu Province, China

Contact name:Huang

Inquir Now

Wuxi Yushun Metallurgical Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

150T MT LRF Steel Making For Refining Molten Steel

Country/Region china
City & Province wuxi jiangsu
InquireNow

Product Details

150T MT Ladle Refining Furnace

The ladle refining furnace is used for refining molten steel. There are several structures for user’s selection: heating bridge type, fourth column type, arm rotating type and ladle turret type. Ladle refining furnace comprises ladle, ladle car and towing cable, furnace roof, electrode lifting mechanism, secondary busbar water-cooling device hydraulic device, argon device, furnace transformer, HV cabinet LV electric and automatic control system, etc. Capacity of LF manufactured by our company is 10-300t.

 

Parameter

No.Product nameUnitDataRemarks
1Block of LF furnaceseat1 
2To deal with every steel water16070 max.
3LF furnace transformer rated capacityMVA1.220% overload
4Primary voltageKV35 
5Secondary voltageV270-250-170No-loading adjust voltage 6 grade
6Secondary currentA27700 
7Heating rate℃/min4.0Max. 6.0
8Electrode diametermm400UHP
9Average refining cyclemin35 
10Electrode moving distancemm2500 
11Electrode moving speedM/min3-4 
12Refining ladle car loadT150 
13Refining ladle car speedM/min12 
14Furnace hearth diametermm∅250060t molten steel surface
15Ladle upper diametermm∅3000 
16Ladle heightmm3700 
17Free space heightmm45060t molten steel surface
18Cooling water inlet≤34 
19Temperature rise≤15 
20Cooling water flowM3/h200 
21Water pressureMPa≥0.35 
22Power supplyV35000(380-220)High voltage(IOW)
23FrequencyHz50 
24Compressed airMpa≥0.4No water no oil

 

Function

 

1. Electric arc heats up and temperature rises under constant pressure, measure temperature and take samples, finally temperature control is accurate so as to optimize casting temperature.

 

2. Synthetic slag goes through refining, desulfuration, deoxidation, degasification and removal of inclusions

 

3. Bottom blowing argon siring. make liquid steel temperature uniform and make components uniform and pure.

 

4. Alloy fine adjustment makes component controlled accurately. The finally required chemical composition could be achieved with high efficiency through ferroalloy element or aluminum or wire feeding.

 

5. Being equipped with wire feeder makes liquid steel realize desulfuration and deoxygenation, changes inclusion pattern and distribution and accurately controls alloy elements. And it has high alloy yield, low temperature drop and low environmental pollution.

 

6. As buffering equipments between primary melting furnace and continuous casting machine, ensure matching production of primary meting furnace and continuous casting, realize sequence casting.

 

 

Characteristics

 

1. Adopting the water cooled furnace roof equipped with dedusting interface of which the size of smoke outlet is adjustable to keep the tiny barotropic atmosphere and reducing atmosphere inside the furnace.

 

2. Using the cooper-steel composited conductive arm, reducing electrode pitch circle diameter and prolonging lining service life.

 

3. Equipped with automatic or manual temperature measurement and sampling device to measure the liquid steel temperature accurately.

 

4. Large current system adopts large-section water cooled cable, compensators and copper-steel composite conducive arm, thus reduce major loop impedance.

 

5. Using alloy and slag automatic charging device to accurately measure the charging volume.

 

6. Equipped with PLC control system and smelting model.


Selling Units: Single item

Single package size: 150*100*170cm

Single gross weight: 100,000kg

Package Type: Safety Seaworthy Package

Lead Time:

Quantity (Tons)1-100>100
Est. Time(Days)60To be negotiated

 

Hot Products

Section Steel Stacker Crane Mechanical Equipment Metallurgical Industry The steel palletizing ...
250t/h Capacity Walking Beam Type Reheating Furnace For Rebar Production Line Manufacturing process ...
Walking Beam Billet 250t/H Rolling Mill Continuous Heating Large-Tonnage Steel material in the ...
Automatic Heating Walking Beam Type 200t/H Capacity Steel Billet Heating Furnace Compared with the ...
100t/h Capacity Walking Beam Type Reheating Furnace For Rebar Production Line Features: 1. Steel can ...
30t/H Capacity Walking Beam Type Reheating Furnace For Steel Product Reheating furnace process ...