Home Companies Chengdu Forster Technology Co., Ltd.

Stepper Microcomputer Hydro Turbine Governor For Guide Vane Opening BWRBWST

Chengdu Forster Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA

Contact name:Nancy

Inquir Now

Chengdu Forster Technology Co., Ltd.

Stepper Microcomputer Hydro Turbine Governor For Guide Vane Opening BWRBWST

Country/Region china
City & Province chengdu sichuan
InquireNow

Product Details

BWRBWST Stepper Microcomputer Hydro Turbine Governor For Hydro Power Plant
 
Main Products:
 
1. Kaplan turbine generators series.
 
2. Turgo turbine generators series.
 
3. Tubular turbine generators series.
 
4. Francis turbine generators series.
 
5. Pelton turbine generators series.
 
Product features:
           
The BWRBWST stepper turbine governor replaces the traditional electro-hydraulic converter with a stepper motor driver and a stepper motor, eliminating the swivel motor speed mechanism and buffer for easy access and maintenance. Due to the use of software frequency measurement, it overcomes many defects of the hardware frequency measurement circuit and makes full use of the advantages of programmable high reliability. Therefore, the stability is good, and the operation is very clear due to the use of the Chinese touch screen display, the running state, the parameter setting, etc. Convenience.
 
The state monitoring of the turbine governor is mainly to realize the real-time monitoring of the state of the governor through the computer, and to master the operating state of the equipment, mainly including various detection, measurement, monitoring, analysis, and discriminating methods, combined with the history and current status of the system, and comprehensive consideration of environmental factors. Evaluate the running status of the equipment, determine whether it is in a normal state, display and record the status, and make an alarm to the abnormal status so that the operating personnel can process it in time to provide basic data for equipment failure analysis, performance evaluation, rational use and safe work. . The typical turbine system speed control system condition monitoring system mainly includes four major components: 1 sensing and transmitter; 2 governor control cabinet; 3 industrial computer and man-machine interface; 4 background integrated diagnostic monitoring system Distributed structure, various sensors are installed on the monitored equipment, the governor control cabinet is responsible for data acquisition, and performs general data processing, conversion and alarm, and communicates with the industrial computer through communication. The industrial computer is responsible for complex data processing and storage. Based on the unified information platform, it realizes the collection of state data of the turbine unit adjustment system, feature calculation, real-time monitoring, fault recording, performance test data record, and comprehensive online diagnosis and status of the background unit. The maintenance assistance decision system provides a reliable source of data.
 
1. measure the frequency of the unit and the power grid, and realize the frequency regulation of the unit when it is running without load or in isolation;
 
2. when no load is on, the unit frequency automatically tracks the power grid frequency, which is convenient for rapid automatic synchronization;
 
3. manually start and stop, increase and decrease load, and operate with load;
 
4. automatically start and stop the machine, and automatically adjust unit output according to permanent slip (bp) after grid connection;
 
5. switch automatically and manually unconditionally and without disturbance;
 
6. main parameters and operation status of speed regulators such as machine frequency, network frequency, guide blade opening, manual and automatic are displayed on the display screen;
 
7. able to set the operating parameters of the governor through the display screen;
 
8. when an electrical fault is detected, it can be automatically cut to manual and the load can be fixed in the state before the fault.
 
9. high reliability programmable controller (PLC), small size, strong anti-interference ability, and an average trouble-free time of more than 300,000 hours;
 
10. software frequency measurement can meet the requirements of timing and accuracy of frequency measurement;
 
11. PID intelligent control, with good stability and adjustment quality
 
Product pictures:
 
             

 
Company Information:
 

 

Our workshop

 

 
Advantages:
 

 

Packaging & Shipping

 

FAQ

 

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   

website address: www.fstgenerator.com













































Hot Products

Professional Micro Hydro Power Solution Automation Panel Tubular Turbine Generator With our ...
Professional Automation Panel Pump Turbine With 10 Years of Technology Research Experience With our ...
Small Turgo Water Turbine generator 55-200 Kw china rc Jet Turbine Engine For Sale Our main products ...
Mini Hydroelectric Generator Water Turbine 20KW 30KW 50KW For Power Station Our main products ...
100KW To 700 KW Turgo Type Deriaz Turbine Generator With Governor Our main products included: 1. ...
Mini Hydro In Line Water Turbine Generators From 3 To 5kw For Sale Our main products included: (1) ...