Home Companies Chengdu Forster Technology Co., Ltd.

1 Mw Francis Hydro Turbine Generator Equipped With Automated Control Panel

Chengdu Forster Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA

Contact name:Nancy

Inquir Now

Chengdu Forster Technology Co., Ltd.

1 Mw Francis Hydro Turbine Generator Equipped With Automated Control Panel

Country/Region china
City & Province chengdu sichuan
Categories Gas Turbine Generators
InquireNow

Product Details

 50 Years Long Life 1 Mw Francis Turbine Generator Equipped With Automated Control Panel For Hpp

 

Our main products included:

 

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series .

 

Product features:

The mixed  flow water turbine we see in various hydropower stations is also known as the Francis turbine, invented by the famous American engineer Francis in 1849, also known as the Francis turbine, or radial flow turbine. Water flows radially into the runner, and then flows out approximately axially. The runner consists of a crown, a ring and a blade. In recent years, the development trend is high head, large capacity, high specific speed and high efficiency.

 

1, suitable for high head,small flow and flow changes in large runoff hydropower station;

 

2. With the power plant investment is small,compact units structure characteristics;

 

3. Has the efficiency changes smoothly,operating a wide range,even in the 15%-20%load is reduced efficiency;

 

4. Suitable for high head small flow station in mountain area;

 

5. A unit construction,simple restrictions without cavitation condition,the advantages of stable ooperation,less investment,construction area.

 

Product parameters:

HL-WJ-Francis tubine generator unitGeneratorGevernor or Regulating workValve
Turbine
TypeWater head(m)Discharge (m³/s)Speed (r/min)Power(kw)Efficiency(%)
HL260 C-WJ-8413.23.9375455.589.6SFW400-16/1180YT-6000PDF6-WD Dg1200
15.14.2375554.389.1SFW500-16/1430
17.74.54375693.488SFW630-16/1430
20.74.9428.6886.488.8SFW800-14/1430YWT-10000
23.95.28428.6108587.7SFW1000-14/1430
285.715001391.488.8SFW1250-12/1430
HL260 C-W(L) J-100 SFW500-20/1730YT-6000PDF6-WD Dg1200
12.15.2830056490SFW500-20/1430
145.72300701.989.4SFW630-20/2150
16.36.18300872.488.4SFW630-20/1730 SFW800 20/2150YWT-10000
18.86.63375110190SFW800-20/1730
21.87.15375136889.56SFW1000-16/2150
25.77.76375172688.1SFW1250-16/2150YWT-18000
30.18.39428.62210.989.2SFW1600-16/2150
SFW2000-14/2150
HL260 C-LJ-12013.17.825087088.5SF800-24/2150YWT-10000PDF6-WD Dg1500
15.18.4 108787.7SF1000-24/2150
17.69.06300135988.6SF1250-20/2600
20.49.76 172088.2SF1600-20/2600
23.710.51 215188.5SF2000-16/2600YWT-18000
27.411.31375267488.2SF2500-16/2600

 

Product pictures:

 

Installation design drawings:

 

 

 
Company Information
 

 

Advantages
 

 

Our workshop
 

 

Packaging & Shipping
 

 

 

 

 

FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website. 

 

Hot Products

Professional Micro Hydro Power Solution Automation Panel Tubular Turbine Generator With our ...
Professional Automation Panel Pump Turbine With 10 Years of Technology Research Experience With our ...
Small Turgo Water Turbine generator 55-200 Kw china rc Jet Turbine Engine For Sale Our main products ...
Mini Hydroelectric Generator Water Turbine 20KW 30KW 50KW For Power Station Our main products ...
100KW To 700 KW Turgo Type Deriaz Turbine Generator With Governor Our main products included: 1. ...
Mini Hydro In Line Water Turbine Generators From 3 To 5kw For Sale Our main products included: (1) ...