Home Companies Hongya Power Generating Equipment To Utilities Limited

High Speed SS Turgo Water Wheel High Strength Long Lifespan 1.1m

Hongya Power Generating Equipment To Utilities Limited

Contact Us

[China] country

Trade Verify

Address: Anxi village, Yuping town,Hongya county, China

Contact name:Jack shen

Inquir Now

Hongya Power Generating Equipment To Utilities Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

High Speed SS Turgo Water Wheel High Strength Long Lifespan 1.1m

Country/Region china
Categories Water Treatment
InquireNow

Product Details

Stainless Steel Turgo Wheel Turbine

 

The operation of a Turgo turbine is very similar to that of a Pelton turbine. In this type of turbine, high speed jets of water emerge from the nozzles that surround the turbine. These nozzles are arranged so the water jet will hit the buckets on one side at an angle of around 20°.This shallow angle allows the water stream to exit on the other side instead of being diverted backwards. Since the incoming and outgoing jets don't interfere like they do in Pelton turbines, this type of turbine is able to accommodate a higher flow rate.

Polishing based on CMM measurement report

Experienced employees polishing according to customer specific procedures

Several dimensional and quality controls through process

Compliance with all environmental standards thanks to the newest filtering technologies

Completed products are checked using four non-destructive testing methods (NDT). 

Visual Testing (VT)

Liquid Penetrant Testing (PT)

Magnetic Particle Testing (MT)

Ultrasonic Testing (UT)

The actual unbalance is displayed in one or two planes by graphical and numerical output. There is also a deviation from the allowed unbalance displayed and a suggestion for the most convenient weight correction.

 

specification

 

runner materialstainless steel
runner typeTurgo
diameter1.1m
capacity500kw
blade No20PCS
weight900KG
 

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

Hot Products

Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a highly efficient and ...
Product Description: Features: Product Name: Francis Hydro Turbine Rated Flow: 0.3-100m3/s Rated ...
Product Description: Francis Hydro Turbine - Efficient and Powerful The Francis Hydro Turbine is a ...
Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a cutting-edge water turbine ...
Product Description: Francis Hydro Turbine - A Modern Francis Turbine for Efficient Hydropower ...
Product Description: Francis Hydro Turbine - Product Overview The Francis Hydro Turbine, manufacture...