Shanghai Yekun Construction Machinery Co., Ltd. |
Verified Suppliers
|
|
Description
VIBRA vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.
Features
VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.
With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.
Technical Parameters
Item | FV-150 | FV-250 | FV-280 | FV-300 | FV-330 |
Vibration Frequency (rpm) | 2500 | 2500 | 2800 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 30 | 32 | 32 | 32 |
Centrifugal Force (KN) | 172 | 265 | 335 | 350 | 372 |
Max.Pile Length (m) | 8 | 10 | 12 | 12 | 12 |
Arm Weight (kg) | 260 | 500 | 500 | 670 | 670 |
Hammer Weight (kg) | 1100 | 1700 | 1900 | 2100 | 2300 |
Excavator (T) | 12~17 | 20-30 | 20-30 | 30-35 | 33-40 |
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: 1 set is available.
Q: What's the payment method?
A: We accept T/T and D/P payment.
Q: What is the delivery time?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can.
Q: How is your product quality?
A: Our production unit is ISO 9001:2015 certified. Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".