Description
Manufactured to the highest possible standards the Solar Pile
Driver comes with a 12 month warranty, making it the best choice
for the demands of solar pile driving. Our specialised and
experienced team are here to support you from purchase, supply of
parts and technical support right throughout the life of the
machine.
VIBRA vibrating pile hammer is utilizing its high frequency
vibration to vibrate pile body with high-speed increase to pass the
vertical vibration of mechanical produce to pile which prompting
changes in the soil structure around the pile, strength decline.
Soil around the piles become liquefaction to lessen frictional
opposition between side of the pile and the soil. Then, at that
point, utilizing the excavator down power, vibrating pile hammer
and pile body weight to sink pile into the soil. When extricating
piles, in the state of vibration to take out the pile by utilizing
excavator lift power. Excitation power required by pile driving
hardware are extensive controlled by site soil, soil condition,
dampness content and sort of pile development.
Equipment Advantage
By assisting different clasps, it can sink and pull out heap of
wood, solid pile, steel sheet pile, steel pipe pile, H-shaft steel,
steel shield, etc |
Essentially any 6-60 ton excavator of any brand can be used for
piling |
It is for the most part used in stream bank, house foundation,
metropolitan association, interface, photovoltaic pile and various
foundations advancement fields |
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
>
About Us
Ye Kun Construction Machinery Co., Ltd. is one specialized is
engaged in the vibration sinking pile drawing machine equipment
production, sale and service of technology-oriented enterprises,
products mainly emerging a high-speed hydraulic pile drawing
machine and peripheral accessories, equipment widely used in all
kinds of foundation engineering construction.
After a short period of development, the company won the
recognition of customers, and the annual sales growth doubled.
Marketing the country with the VIBRA brand and export it. The
company′s production of mini hydraulic pile driver, vibration
hammer and other products quality has reached the advanced level of
the industry.
The company has a young and enterprising team cooperation, in order
to respect the customer value as self value, to become the most
reliable, the most comprehensive, the most professional vibration
pile machine equipment and service suppliers and make unremitting
efforts.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of
installation, the mainframe and key components, except for wearing
parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai
Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the
technical standards of "Technical Conditions for Pile Driver
Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to
further developing into a regional general agent and strategic
partner like you with lofty ideals!
Q: How To Order?
A:
1. Please tell us the model with quantity and other requirement
which you needed.
2. We issue the Proforma Invoice to you after confirmed the price
and other details.
3. We arrange the order production upon receipt of confirmed PI and
your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the
shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.