Home Companies Shanghai Yekun Construction Machinery Co., Ltd.

Construction Projects 18 Ton Mini Excavator Pile Driver Stable Running

Shanghai Yekun Construction Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.3652, Cao'an Road, Jiading district, Shanghai

Contact name:Shaun

Inquir Now

Shanghai Yekun Construction Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Construction Projects 18 Ton Mini Excavator Pile Driver Stable Running

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

Mini Excavator Mounted Hydraulic Pile Driver

 

Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.

This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.

 

Equipment advantages:

The structure is ultra-small and lightweight, and the vibration force is maximized.

Upgraded to the fourth generation model, more reasonable mechanical structure, high stability of the machine;

It can be used in the construction of narrow river course and house foundation, and can be used for drawing steel sheet piles, cement piles, wooden piles, etc.

 

Matched model: 6-18 ton excavator

 

Application

 

By assisting different clasps, it can sink and pull out heap of wood, solid pile, steel sheet pile, steel pipe pile, H-shaft steel, steel shield, etc
Essentially any 6-60 ton excavator of any brand can be used for piling
It is for the most part used in stream bank, house foundation, metropolitan association, interface, photovoltaic pile and various foundations advancement fields

 

 

Description

 

VIBRA vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.

 

 

Technical Parameter

 

ItemFV-100FV-150
Vibration Frequency (rpm)25002800
Operation Pressure (Mpa)3032
Centrifugal Force (KN)117172
Max.Pile Length (m)68
Arm Weight (kg)160260
Hammer Weight (kg)8501100
Excavator (T)7-1212-17

 

About Us

 

Shanghai Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.

 

After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.

 

The company has a young and enterprising team cooperation, in order to respect the customer value as self value, to become the most reliable, the most comprehensive, the most professional vibration pile machine equipment and service suppliers and make unremitting efforts.

 

FAQ

 

Q: How long is the warranty period?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ?

 

A: One set is available.

 

Q: What's the payment method?

 

A: We accept L/C, T/T and D/P payment.

 

Q: What is the delivery time?

 

A: The delivery time is generally 1-8 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine?

 

A: Of course you can.

 

Q: How is your product quality?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

 

Q: How To Order?

 

A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.

 

 

Hot Products

Features VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular ...
850kg vibro hammer for small excavator performs 6 meter piling work Mini Excavator Mounted Hydraulic ...
Blue color 9 meter side grip vibro hammer for narrow working space Side Grip Pile Driver More secure ...
Multi Color vibro hammer with 8 meter pile driving capability in the rural areas Description Noise ...
8 meter vibro hammer with 172KN centrifugal force can drive pile in hard soil Mini hydraulic pile ...
6 to 10 meter sheet piling work with ultra-small structure and lightweight vibrating hammer ...