Gu'an Jingyuan Filtration Equipment Co., Ltd. |
|
Introduction
It can remove dirt, water and gas from hydrocarbons and other oils.
The outer medium filters out silt, rust and other particulate
contaminants. The inner layer absorbs water and chemically bonds so
that no water is released downstream.
When the AC series filter cartridge reaches its water retention
limit, the medium swells and the pressure difference increases
rapidly. This signals the operator that the ink cartridge must be
replaced.
Advantage
1.High oil flow
2.Low flow resistance
3.High dust holding capacity
4.Heavy construction
Chemical resistance | Excellent | Size : | Can be customized |
Suitable for: | Water separator | Warranty: | 1 year |
Material: | Iron (shell), rubber (gasket), PU (filter element) | Payment terms | TT |
Color: | White/yellow/custom | Certifiion: | SGS / ISO9001 |
Packaging | cowhide box + five-layer board box | Car Model: | excavator |
JingYuan Filtration is a manufacturer specializing in the production of filter elements, filters, filtration equipment, and filter elements for dust removal equipment. Mainly engaged in the development and production of gas filtration and separation technology and fluid pollution control filtration products.
We have more than 50 employees and more than $1 million. Of the industrial filtration products, 65% are exported all over the world. In all stages of production, our well-equipped facilities and excellent quality control have won customer satisfaction.
Due to high quality and excellent customer service, we have gained a global sales network throughout the United States, Europe, South America, the Middle East and Asia.
Q1. What is your packaging policy?
Answer: Generally speaking, we pack the products in neutral white
boxes and brown cartons. If you have a legally registered patent,
we can put the product in your branded box after receiving your
authorization.
Q2. What are your payment terms?
A: T/T 30% as a deposit, 70% before delivery.
Before we pay the balance, we will show you the product and package
photos.
Q3. What are your delivery terms?
Answer: EXW, FOB, CFR, CIF, DDU.
Q4. What is your delivery time?
A: Generally, it takes 10 to 15 days after receiving the advance
payment. The specific delivery time depends on the item and
quantity of your order.
Q5. Can you produce according to samples?
A: Yes, we can produce according to your samples or technical
drawings. We can manufacture molds and fixtures.
Q6. What is your sample policy?
A: If we have spare parts in stock, we can provide samples, but the
customer must pay the sample fee and freight.
Q7. Have you tested all the products before delivery?
A: Yes, we do 100% testing before delivery