CHANGSHU HONGYI NONWOVEN MACHINERY CO., LTD |
|
Cushion Stuffing PP Cotton Fiber Carding Wool Opener Cushion Pillow Filling Machine Polyester Fiber Opening Machine
1. suitable for Long or short fiber, wool, Polyester fiber,
Spewing, PP cotton, scrap, etc.
2. For pillows, cushions, sofas, cushions, pillows, etc. need to
fill cotton fiber product
3. Can open cotton and fill cotton one time
4. Fiber opening rate can reach 99%.
5. Filling quickly and easy operation ,just need 1-2 people
6. Using a foot switch to control cotton filling machines and
opening machine.
7. Fiber open machine adopts Imported skid conveyor belts, cotton
filling machines widened width
8. cotton open and carding machine including 7 small drum and one
big drum, has front and rear setback function.
Functionality & application:
1. Preliminary opening the raw material fibers,
2. While it also helps to filter off impurities and mix the fibers.
3. Available for opening various fibers
Features:
1. Photoelectric and automated control for quantity feeding
2. High efficiency and minimized impairment of fiber.
3. Enclosed design largely reducing the dust and flocks.
4. Convenient maintenance
Technical parameters:
Working width | 1000mm, 1300mm, 1500mm |
Capacity | 250kg/h, 500kg/h, 650kg/h |
Rotary speed | 900RPM |
Opening method | Pin board, carding wire |
Installed power | 15.2Kw |
Trade information:
Trade terms | FOB, CNF, or CIF |
Lead time | 90 days after deposit. |
Payment terms | 30% advance payment, 70% paid off before delivery. |
Warranty | twelve (12) months after mechanical and electrical commissioning. |
After-sale service | The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD180/Day/engineer and totally installation period is about 30-40 days depending on well cooperation of the buyer. |