Wuxi High Mountain Hi-tech Development Co.,Ltd |
Verified Suppliers
|
|
PE100 Water Supply Pipe Municipal Greening Drinking Water Plastic Pipe
----------------------------------------
Basic Info.
Pipe connection:
1. Electric welding: use special electric welding machine to
connect the straight pipe with the straight pipe and the straight
pipe with the pipe fittings. It is generally used for pipes below
160mm.
2. Hot-melting butt connection: use special butt welding machine to
connect pipes, generally used for pipes above 160mm.
3. Steel-plastic connection: flange, threaded thread and other
methods can be used for connection.
In order to facilitate construction and ensure construction
quality, corresponding tools should also be prepared.
For example: rotary cutter - cutting pipe; Rotary scraper -- remove
the oxide scale on the pipe surface; Wall-climbing scraper - scrape
the scale on the surface of large-diameter pipe; Gas cut-off tool -
realize on-site operation of gas cut-off.
Outer Diameter DN (mm) | SDR 9 PN20 | SDR 11 PN16 | SDR 13.6 PN12.5 | SDR 17 PN10 | SDR21 PN8 | SDR26 PN6 | Packing Loaded into 40GP/Piece 6m or 12m per Piece |
Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | ||
75 | 8.4 | 6.8 | 5.6 | 4.5 | 1085 | ||
90 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | 754 | |
110 | 12.3 | 10 | 8.1 | 6.6 | 5.3 | 4.2 | 504 |
125 | 14 | 11.4 | 9.2 | 7.4 | 6 | 4.8 | 378 |
140 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 | 304 |
160 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 | 224 |
180 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 | 182 |
200 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 | 143 |
225 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 | 110 |
250 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 | 90 |
280 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 | 72 |
315 | 35.2 | 28.6 | 23.2 | 18.7 | 15 | 12.1 | 56 |
355 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 | 42 |
400 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 | 30 |
450 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 | 25 |
500 | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 | 20 |
560 | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 | 16 |
630 | 70.3 | 57.2 | 46.3 | 37.4 | 30 | 24.1 | 12 |
710 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 | 9 | |
800 | 72.7 | 58.8 | 47.4 | 38.1 | 30.6 | 6 | |
900 | 81.8 | 66.2 | 53.3 | 42.9 | 34.4 | 6 | |
1000 | 90.2 | 72.5 | 59.3 | 47.7 | 38.2 | 4 | |
1200 | 88.2 | 67.9 | 57.2 | 45.9 | |||
1400 | 102.9 | 82.4 | 66.7 | 53.5 | |||
1500 | 110.2 | 88.2 | 71.4 | 57.6 | |||
1600 | 117.6 | 94.1 | 76.2 | 61.2 |
Details
Application
1. City, township water pipe system: PE water supply pipe is safe,
non-toxic, hygienic, and non-scaling, and has become an ideal pipe
for water supply in cities and towns;
2. Natural gas and coal gas pipelines: PE water supply pipes have
good creep resistance and economy, and have become the only choice
for natural gas pipelines;
3. Renovation of old pipes: it can be used to replace cement pipes,
cast iron pipes and steel pipes, without large-scale excavation,
and PE water supply pipes can be directly inserted, which is
convenient for construction and low in engineering cost, especially
suitable for pipeline transformation in old urban areas;
4. Landscaping pipe network: Landscaping requires a large number of
water pipes. PE water supply pipes are flexible and low-cost, which
is the best choice;
5. Sewage discharge pipe: PE water supply pipe has unique corrosion
resistance and is suitable for the discharge of industrial
wastewater and sewage. It not only has a long life, but also has
low cost and maintenance costs;
Certificate
Company Profile
High Mountain Pipe Management Industry is mainly use HDPE
recycled plastic to develop and produce plastic industrial film.
Production of non-toxic, green, corrosion-resistant, and good
performance MUHDPE alloy pipes, HDPE national standard corrugated
pipes, HDPE national standard corrugated pipes, EPTU three-wall
seismic and impact resistant pipes, HDPE steel belts to increase
strength spiral corrugated pipes, SRWPE plastic steel dimensional
winding pipes , HDPE double wall corrugated pipe, FRPP double wall
reinforced corrugated, HDPE water supply pipe, CPVC cable
protection pipe, PE porous general cable protection pipe, FRP sand
pipe, plastic inspection well and related supporting series
products. Provide research and development for different municipal
construction pipe network projects. Integrated services in
production, sales, installation and engineering skills
FAQ
Q: How and when can I receive my goods after payment?
A: For small batch products, they will be delivered to you by
international express (DHL, FedEx, TNT, etc.) or by air. It usually
takes 3-5 days to receive the goods after delivery. For high-volume
products, it is worthwhile to see the goods and deliver them. It
takes several days to several weeks to reach the destination port,
depending on the location of the port.
Q: Is the price on this page correct?
A: The listed prices are for reference only, please contact us
directly for the latest prices.