Basic Info.
Hot-melt connection refers to the use of polyethylene pipes and
pipe fittings that can be connected by hot-melting, and the
strength of the connection can exceed the body strength of the
pipes and fittings. This connection is possible with pipes of
polyolefin material, with outstanding advantages.
1. Butt-type hot melt connection
The butt-type hot-melt connection method is generally used for
pipes with a diameter of 63MM or more.
The butt-type hot-melt connection is to heat two pipes or a pipe
and a butt-type HDPE pipe fitting with a butt machine through a
heating plate, and then butt-weld as a whole, and it can be fixed
after cooling. Before welding, make sure that two HDPE water supply
pipes or one pipe and HDPE butt fittings are kept in a straight
line, and the pipe section should be flat.
2. Socket type hot melt connection
The socket-type hot melt connection is suitable for pipes and
fittings with relatively small diameters (generally below DN63mm),
because the pipes and fittings with small diameters have thin walls
and small cross-sections, and it is difficult to ensure quality by
using butt joints.
The socket-type hot-melt heat capacity connection of HDPE pipe uses
a small hot-melt device to heat the pipe end and the
socket-and-socket pipe at the same time. After melting, insert the
HDPE pipe into the pipe fitting, press the two parts that need to
be connected, and keep it cool. It can be fixed.
Size | PN2.0MPa | PN1.6MPa | PN1.25MPa | PN1.0MPa | PN0.8MPa | PN0.6MPa | |
SDR 9 | SDR 11 | SDR 13.6 | SDR 17 | SDR 21 | SDR 26 | ||
OD(inch) | OD(mm) | thickness | thickness | thickness | thickness | thickness | thickness |
1/2 | 20 | 2.3 | 2.3 | ||||
3/4 | 25 | 3 | 2.3 | 2.3 | |||
1 | 32 | 3.6 | 3 | 2.4 | |||
1 1/4 | 40 | 4.5 | 3.7 | 3 | 2.4 | ||
1 1/2 | 50 | 5.6 | 4.6 | 3.7 | 3 | ||
2 | 63 | 7.1 | 5.8 | 4.7 | 3.8 | ||
2.5 | 75 | 8.4 | 6.8 | 5.6 | 4.5 | ||
3 | 90 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | |
4 | 110 | 12.3 | 10 | 8.1 | 6.6 | 5.3 | 4.2 |
5 | 125 | 14 | 11.4 | 9.2 | 7.4 | 6 | 4.8 |
5 | 140 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 |
6 | 160 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 |
7 | 180 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 |
8 | 200 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 |
8 | 225 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 |
10 | 250 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 |
11 | 280 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 |
12 | 315 | 35.2 | 28.6 | 23.2 | 18.7 | 15 | 12.1 |
14 | 355 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 |
16 | 400 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 |
18 | 450 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 |
20 | 500 | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 |
22 | 560 | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 |
24 | 630 | 70.3 | 57.2 | 46.3 | 37.4 | 30 | 24.1 |
28 | 710 | 79.3 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 |
32 | 800 | 89.3 | 72.6 | 58.8 | 47.4 | 38.1 | 30.6 |
36 | 900 | 81.8 | 66.2 | 53.3 | 42.9 | 34.4 | |
40 | 1000 | 90.2 | 72.5 | 59.3 | 47.7 | 38.2 | |
48 | 1200 | 88.2 | 67.9 | 57.2 | 45.9 | ||
55 | 1400 | 102.9 | 82.4 | 66.7 | 53.5 | ||
60 | 1500 | 110.2 | 88.2 | 71.4 | 57.6 | ||
65 | 1600 | 117.6 | 94.1 | 76.2 | 61.2 |
Details
Application
HDPE sewage treatment pipe refers to a system of pipes, canals and their ancillary facilities that collect and discharge sewage, waste water and rainwater. Including mains, branches and pipes leading to the treatment plant, whether built on the street or anywhere else, should be counted as drains as long as they are drains. HDPE chemical pipes have high chemical resistance to rings dissolved in civil and industrial wastewater.
Certificate
Company Profile
High Mountain Pipe is A company specializing in the production of PE water supply pipes, PE gas pipes and PE flame-retardant, anti-static mining pipes, PE ground source heat pump pipes, PE siphon drainage pipes, PERT floor heating pipes and supporting PE water supply pipes, PE gas pipes, PE flame retardant, anti- High-tech enterprise of series products such as double-resistance pipe fittings for electrostatic mine, PE ground source heat pump pipe fittings, PE sprayed anticorrosive steel flanges, PE ball valves, PERT floor heating pipe fittings, PE siphon drainage pipe fittings, etc.
FAQ
Q: How and when can I receive my goods after payment?
A: For small batch products, they will be delivered to you by
international express (DHL, FedEx, TNT, etc.) or by air. It usually
takes 3-5 days to receive the goods after delivery. For high-volume
products, it is worthwhile to see the goods and deliver them. It
takes several days to several weeks to reach the destination port,
depending on the location of the port.
Q: Can I customize the size I need?
A: Yes
Q: How to buy products?
A: Send an email to us and we will get back to you within one day.