herong electric |
Verified Suppliers
|
|
After the body is vacuum-dried, it is adjusted, and then it is installed in the oil tank and filled with transformer oil that has passed the purification treatment. Reactors with voltage levels of 35kV and above should be vacuum dried and then immersed in oil. In addition to the body and the fuel tank, the main components of this type of reactor include outlet bushings, radiators, oil storage tanks or metal expanders. The radiator compensates.
The connection of the reactor is divided into two ways: series
connection and parallel connection.
(1) Epoxy cast dry iron core shunt reactor: used to compensate the
capacitive charging current of the line, limit the rise of the
system power frequency voltage and operating overvoltage, thereby
reducing the insulation level of the system and ensuring the
reliable operation of the line. With the continuous expansion of
the scale of my country’s cities and the transformation of urban
power grids, overhead line transmission is gradually being replaced
by underground cables, which makes the capacitive charging current
of the transmission network increase sharply. In order to reduce
the increase in the power frequency voltage of the system and the
system The insulation level ensures the safe and reliable operation
of the system and the quality of the power supply of the urban
power grid. The shunt reactor, which was widely used in
high-voltage and ultra-high-voltage, long-distance power
transmission systems, has been widely used in urban power
distribution grids.
(2) Epoxy cast dry iron core series reactor, installed in the
capacitor circuit, plays the role of suppressing the inrush current
when the capacitor circuit is put into operation, and also forms a
harmonic circuit together with the capacitor bank for specific
harmonic filtering In addition to the role.
(1) Altitude: no more than 1000 meters.
(2) Ambient temperature: -40~45℃.
(3) Relative humidity: not more than 90%.
(4) Wind speed: ≤ 35m/s.
(5) Earthquake intensity: not more than 8.
(6) Installation location: indoor or outdoor.