Home Companies Langfang pangolin construction machinery co. LTD

200GPM 50㎥/H 2 Stage HDD Slurry Mud Recycling System

Langfang pangolin construction machinery co. LTD
Active Member

Contact Us

[China] country

Address: Guangyang Plot, Langfang City, Hebei Province, China

Contact name:janne 

Inquir Now

Langfang pangolin construction machinery co. LTD

200GPM 50㎥/H 2 Stage HDD Slurry Mud Recycling System

Country/Region china
City & Province langfang hebei
InquireNow

Product Details

200GPM 50㎥/H 2 Stage HDD Slurry Mud Recycling System

 

Good Capacity And Performance HDD Mud Recycling System

 

 

The main structure features

1. Good capacity and performance: the system capacity is up to 240m3/h (1000GPM), can meet the mud treatment of large-scale trenchless projects.
2. The equipment parts are fast connected, easy to disassemble, saving time.
3. High wear-resistant polyurethane cyclone is the same as international brands, and can be use more than 3,800 hours, long service life, interchangeable.
4. Explosion-proof light to meet night construction, easy to operate and safe.

 

 

Advantages

1. With modular design and small footprint, it can be flexibly configured and installed according to the customer’s requirements.
2. The side plates of mud tanks are designed with corrugated and load-supporting type, which are safer and can bear more load.

3. Adapt to severe drilling operation conditions, with the functions of cold resistance, heat resistance, explosion proof, leakage proof, corrosion resistance and rain proof.

4. Simple installation and disassembly, easy for drilling personnel to move frequently.
5. The system adopts a centralized electric control, being convenient for operation.
6. All equipment is designed with corrosion and wear resistance, with a long service life.

 

Product parameters

 

CustomizedYES
Capacity50-240 ㎥/h (200-1000 GPM)
Screen Area2.2-8.4 ㎡
Separation Stage2stage / 3stage
Tank Volume5-30 ㎥
Total Power25-184 Kw
Total Weight5.5-20 t
Land Transport Dimension (mm)customized
Screen materialPolyurethane
Cyclone (mm)250 -900
Impeller materialCr26
ApplicationDrilling
SpecificationCan be customized according to requirements

 

ModelCSJ-FN-30CCSJ-FN-60CCSJ-FN-120CCSJ-FN-200C
Capacity (m3/h)3060120200
Slurry pumpModelDC-EHM-1.5CDC-EHM-3CDC-EHM-3CDC-EHM-4C
Power (Kw)7.5112237
Pressure (MPa)1.0~2.0
Shale shakerPower(Kw)1.5233
Vibration force(KN)30406060

Screen

size (mm)

UP1400X6001700x7001900X10002100x1200
Down1400X6001700x7001900X10002100x1200
Cone ModelFN-100FN-150
Cone Number36128
Separation size (μm)10-30
Total Power (KW)9132540
System Max.Size(mm)1650X1450X21502000X1600X22502170X2000X24002400*2300*2400
System weight (Kg)1200190025003500

 

 

Introduction

HDD mud recycling system is design for Horizontal Directional Drilling ( HDD ) rig.

Depending on drilling mud requirement, a HDD mud recycling system can including shale shaker, desander cyclone, desilter cyclone, decanter centrifuge, mud tank, mud agitator, mud gun, transfer pump, etc. The shaker screen mesh size will depending on a shaker performance for mud flow and drilling mud separation at different mud requirement.

 


HDD Mud Recycling System Working Procedure

1. There is a drill pit at each side of drilling hole, a set of vertical slurry pump will set on top of mud pit for feeding shale shaker. The shale shaker screen will separate drilling cuttings and discharge out, fluids part will drop into sand trap through screen hole.

2. After placing 1 or 2 or 3 sets of desander cyclone separators on the shale shaker, a set of centrifugal pumps will provide swirling feed for the desander for the second phase separation. The solids in the desander will be directly discharged into the desander or the slitter box, and the excess liquid will flow out of the desander into the desander compartment.

3. The desander goes through a cyclone separator of the desander for fine solid separation. The solids coming out of the desander will be discharged into the vibrating screen or chip cutting box, and the liquid flowing out of the desander will fall into the desander compartment.
4. A mixing pump sit on tank skid for drilling mud transfer and feed mud into mud hopper for new mud remix by new chemicals. The mixing hopper can sit on top of tank or tank skid as per client’s demand.

 

 

 

Pic Show

 

 

 

FAQ:

 

1. How to order the products?

A: Please send the inquiry with detail item description or with Model number.

 

2. How about the common packing?

A: If there is no special packing demand, we will take it as our normal packing. First in small carton, and then put in the bigger carton together to make sure goods completed.

 

3. Can I expect a quality products?

A: Yes. mature production technology ensuring the quality satisfy international request.

 

4. How to control quality?

A: We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.

 

5. Fast delivery time:

A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.

 

6. Competitive price:

A: Our factory can supply you the lowest price due to direct sale to customers without distributor!

 

Hot Products

Cutting Structure Hole Opener Roller Cone Bit Sealing And Lubrication Product parameters Reamer Size ...
High-quality API downhole mud motor for surface drilling in oil fields Features: The mud motor has ...
Cone bit tungsten carbide blade tri-cone oil well bit​ Describe 1. The cutting structure of this ...
Big chisel oil field drilling tri-cone bit is a drilling rig Describe 1. Sealing and lubrication of ...
High-efficiency tri-cone bits for mining machinery parts and drilling equipment for drilling ...
High-efficiency tri-cone bits for mining machinery parts and drilling equipment for drilling ...