Jinan Darin Machinery Co., Ltd. |
|
Rawhide Bone Hydraulic Machine For Dog Treats with factory pricect Description
Product Description
Dog Chews Rawhide Machine, Dog Chews Machine, Dog Chew Bone Machine
can produce pet chewing bone with cowhide, pigskin, beef tendons or
sheepskin as material. It could press the material to be various
shapes and sizes.
Good Price and High Quality Hydraulic Press Equipment for Animal
Chews could produce pet chewing bone with cowhide, pigskin or
sh-eepskin as material. It could press the material to be various
shapes and sizes.
Features
1, This Punching Machine is type of Flour Column and Three Board,
the up-most output tonnage is 20t.
2, It can be adjusted among the range of 5t-20t according to the
different products’ procedures, the purpose is to arrive the best
required output. Cylinder Stroke is 200mm, (slide stroke is 200mm).
3, The dimension of effective working surface is 500mm*400mm, the
close height is 200mm. Well, our DR-200 Punching Machine has two
types, manual operation and automatic operation, meanwhile, it can
count and timing automatically, safe and protective.
Machine Picture
Technical Parameters
Project | DR-20T |
Liquid Pressure of Work (MPa) | 14-21 |
| 5-20 |
| Left and Right 500 |
| |
Working surface size (mm) |
|
Front and Back 400 | |
Height of Working Table Off the Ground(MM) | 780 |
Biggest Operational Height(mm) | 400 |
Close(mm) | 200 |
| 200 |
Motor Power | 5.5KW |
Structural Style | Flour Column Three Board |
| Above Oil Cylinder |
| 380VAC,50/60Hz |
Weight | 1108kg |
Dimension | 600*500*1780mm |
Sample Picture
Certificate
Packaging
Customer Visit
Exhibition
Factory & Office
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 5-7 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.