Home Companies Dongguan Zehui machinery equipment co., ltd

Polyurethane Multi Sponges Low Pressure Foam Machine Fully Automatic Efficient

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Polyurethane Multi Sponges Low Pressure Foam Machine Fully Automatic Efficient

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Fully Automatic Efficient Polyurethane Multi Sponges Foaming Machine Line

 

 

Description:

 

This machine is the automatic horizontal continuously foam making production line make the foam for mattress and sofa. This machine control by the PLC and invertor automatic with the touch screen. Can be save more than 200sets of formular inside it is easy for the user to operate the machine and we will also offer the formular and all the technology.

 

(1) The whole machine parts specifications:

 

1, Foaming controlling Platform (standard)    L3m×W2.52m×H0.7m

2, Oven declining board (standard)    L6.8m×W0.98m~2.3m

3, Oven side links (standard)     L18m×W2.3m×H1.2m

4, Oven machine frame (standard)     L18m ×W4m×H3m

5, Oven inner conveyer line (standard)     L18m×W2.3m×H0.83m

6, Foam block cutter machine (standard)     W2.3m×H1.30m(knife belt with cross type )

7, R.S. Pulling system    one set

 

1, Dimension:Total length 35m×Total width 4m×Total Height 3m
2, Foaming material Group: 13 groups, man-machine interface, both manual and computerized control.
3, Foaming width: 980mm~2350mm
4, Foaming height: Max 1300mm
5, Foaming density: 8Kg/m³~100kg/m³
6, Foaming speed: 2000r/min~7000r/min
7, Max total output:300kg/min
8, Material spraying way:
① The way of down sprayer head (upper, down, front, back can be adjusted)
② The way of trough overflow pipe.
9, Controlling way of foaming:
①PLC controlling, can continuously foaming two different formulas in one time
②All inverter controlling foaming and work in phase with the production line
③Oven declining board height and width can be adjusted by control box.
④Oven side links width can be adjusted by control box.
10, Mixing –head motor: 37kw
11, Total power: About 90kw

 

 

(2)Transducer Types

 

ModelPower/kw

Use

QtyBrand
G12037

Mixing head

1Siemens
G1207.5

POP, CaCo3

2Siemens
G1205.5

PPG,

1Siemens
G1204

TDI, Flame retardant

2Siemens
G1202.2

MC, color

2Siemens
G1201.5

Water, Ann, Si, Tin, Color Anti-yellow etc

7Siemens
G1200.75

Spray head

1Siemens
VFD-B5.5/3.7/1.5

Oven inner conveyer line,side conveyer line, cutting machine

3Delta

 

Machine Main Specifications:

 

Oven Length18mInner Conveyer length

                                                                           18m

 

Foaming Height1.0-1.25mSide Borar Adjustable Width0.98-2.3m
Foaming Width1.0-2.25mConveyer Belt Speed0-8m/min
Foaming Density8-100kg/m3Fall PlateSix section adjustable
Total Power130KWTotal output100-300kg/min
MotorDongguan/SiemensPumpU.S. Viking /Japan Shimadzu/China Shanghai
 

Terms of Payment: 30% advance payment by T/T upon signing the contract

70% covered by T/T before delivery or sight confirmed L/C.

 

Installation and Start-up: 2 technicians will be assigned to coordinate installation,commissioning and

training, cost for flight and suitable accommodation plus USD50/day will be charged additionally.

 

Warranty: 12 months limited warranty. Starting from date of delivery excluding wear parts.

Shipping cost for parts to be replaced during warranty period have to be borne by the customer.

 

 

FAQ

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

 

Hot Products

High Rebond And Memory Foam Making Production Line Five Formular Continuous Product Description The ...
Continuous Foam Production Line / Foam Manufacturing Equipment For Mattress ZHMACH Horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress ZHMACH Horizontal Continuousl...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress ZHMACH Horizontal Continuous...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress The ZHMACH horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress Description of Foam ...